Monday 23 October 2017

Check the record of Laing O'Rourke winner of £700m Brent Cross pre-construction contract



--> It was announced today that Laing O’Rouke has been appointed under a pre-construction agreement as part of a two stage tender process for the main construction work of the Brent Cross  regeneration with an overall value of £700m.
Laing O’Rourke will work with Hammerson and Standard Life Investments to finalise the design and procurement in order to enable a start on site in 2018. 

The regeneration of Brent Cross London will double the size of the existing centre to 2 million sq ft of retail and leisure space. This will include up to 150 new retail stores and 50 new restaurants, a leisure and cinema offer, hotel accommodation and, it is claimed, improved public spaces including a new town square. The plans also include a relocated and enlarged bus station as well as, it is claimed, improved transport and highways infrastructure.

The regeneration has been opposed by residents in both Barnet and Brent concerned with over-development and and a significant increase in traffic. See Coalition for A Sustainable Brent Cross

O’Rourke hit problems earlier this year when it posted a £245m loss as a result of a PFI contract in Montreal. LINK

Earlier in October this year  two subsidaries of the company were fined a total of £3.8m after a worker was crushed by an 11 tonne concrete panelin Worksop in 2014. LINK


HSE inspector Stuart Pilkington said after the hearing: “This tragic incident led to the avoidable death of a young man, whose death could easily have been prevented if the companies had acted following previous warnings to identify and manage the risks involved, maintain the equipment, and put a safe system of work in place.”


Laing O’Rourke was fined £800,000 in March of this year over an incident in which, again in 2014, a worker crushed his own brother to death while driving a dumper at a building site for a multi-storey car park at Heathrow Terminal 2. LINK




2 comments:

  1. Still awaiting CPO result.

    May never happen.

    ReplyDelete
  2. CPO results, in the plural. CPO 1 and 2 were heard last year and there's still no report. CPO3 has only just happened.

    ReplyDelete