Brent Council appear to be trawling through submissions on their Planning Portal to correct those clearly against the Wembley Stadium increase in event days and removal of capacity cap, but that have been classifed by the software as 'Neutral'. LINK
There are now 108 on-line submissions.
Many residents have encountered problems posting their comments on line (This is the LINK). The deadline has now been extended to March 9th, 2016.
As an alternative comments can be sent by email to alice.lester@brent.gov.uk quoting 'Comment on 17/0368'. Remember to state clearly your position (Support/Object/Neutral) on proposed variation of Condition 3 and removal of Condition 33. Postal comments can be sent to Alice Lester, Planning Department, Brent Civic Centre, Engineers Way, HA9 0FJ.
Details from the Planning Application:
There are now 108 on-line submissions.
Many residents have encountered problems posting their comments on line (This is the LINK). The deadline has now been extended to March 9th, 2016.
As an alternative comments can be sent by email to alice.lester@brent.gov.uk quoting 'Comment on 17/0368'. Remember to state clearly your position (Support/Object/Neutral) on proposed variation of Condition 3 and removal of Condition 33. Postal comments can be sent to Alice Lester, Planning Department, Brent Civic Centre, Engineers Way, HA9 0FJ.
Details from the Planning Application:
CONDITION 3 OF THE WEMBLEY STADIUM
PLANNING CONSENT – THE CURRENT EVENT CAP
This condition restricts the number of
full capacity events (up to 90,000 people) held at the stadium each year to 37
until certain transport improvements* have been completed. There is no
restriction on the number of events that can be held that only use the lower
and middle tier of the stadium (up to a capacity of approximately 51,000). The current
restriction allows 22 sporting events and 15 non-sporting events (although 3
additional sporting events can be held provided the number of non-sporting
events is reduced by2 for each additional sporting event).
* This restriction falls away once
certain public transport and highway works are completed.Most of the works
have been completed, including an increase in the capacity of Wembley Park
Station and significant road improvements within the Wembley
Industrial Estate. However, the upgrading of one element of road within the
industrial estate required the purchase of a significant amount of land and
this was not completed.
PROPOSED VARIATION OF CONDITION 3 – THE
PROPOSED CHANGE TO THE EVENT CAP
The applicant proposes that this
condition is varied to allow up to 31 additional full capacity major Tottenham Hotspur
Football Club sporting events between 1 August 2017 and 31 July 2018 (events
with a capacity of between 51,000 and 90,000 people).
(NOTE: These additional events could
take place without any variation to the planning consent, under the existing
cap, where capacity would be limited to up to a maximum of approximately 51,000
people).
PROPOSED REMOVAL OF CONDITION 33
Condition 33 restricts the number of
times that traffic management measures can be implemented each year, with
specific reference to North Circular Road traffic flow. The applicant proposes
that this condition is removed, specifying that TfL consider
the traffic management measures to have a positive impact on trafficflow within
the North Circular Road.
just attempoted to comment and it says consultation has ended
ReplyDeleteNot so, I have just logged on & I am able to make a comment should I wish to. Please try again Francis.
ReplyDeleteSneaky tactic by Brent council by not writing to local residents to male them aware of this survey