Brent Council's objections to Geron Way Waste Transfer Station

Despite several requests before Christmas to Brent Planning for a copy of the Letter of Objection sent to the London Borough of Barnet regarding the planning application for the waste transfer station at 2 Geron Way, Cricklewood, NW2 6GJ, I received no response from the officer concerned and the planning south office did not know of its existence. I looked on the Planning Portal of the London Borough of Barnet for a copy to no avail. It is clearly a problem that there is no reasonable access to the document in either borough.

4.1.18 Brent Council has now provided a much more legible copy of their objection letter to Barnet Council

Summary of Letter of Objection dated December 7th 2017

The London Borough of Brent objects in principle to the provision of a waste transfer station in this location, on the western side of the railway with vehicular access from Geron Way.

Impact on residential amenity and highways impact: Brent objects to the proposal on this ground. The impact on the highway network from the heavy goods traffic generated by the proposal is such that it would have an unacceptable impact on the flow of traffic, with consequent harm to the road network and amenity of residents in the area by reason of the environment created.

Traffic Volumes: The letter contains a detailed analysis and comments 'this results in an average daily total of 227 arrivals and 49 departures for the maximum 226,000 tonne capacity. This is about three times the number of Heavy Goods Vehicles surveyed accessing the existing site on Brent Terrace. Spread evenly over a 10 hour day, this would equate to 23 incoming loads and 5 outgoing loads per hour.  Flows would therefore total 56 two-way movements per hour which is a considerable increase over the existing HGV volumes. (More in document)

Environmental Impact: Brent is concerned that the proposal has not adequately demonstrated that there will not be an impact on environmental quality. In the event of an approval to ensure protection of the environment, the following conditions should be imposed:

Prior to the commencement of the development these matters should be submitted to and approved by the local planning authority and implemented as approved:
  • plans for the continual assessment of emissions and maintenance of the air treatment system/odour abatement system of the enclosed waste transfer station
  • a scheme to protect the occupants of neighbouring residential accommodation from high concentrations of air pollutants; any potential source of nuisance should be identified and incorporated in this scheme with a schedule of mitigation measures.' The schedule of mitigation shall include but not be limited to the impact upon noise vibration, dust, odour and any other emissions that may affect the general amenity of the neighbouring receptors. (More in document)




Residents urged to comment on Cricklewood Aggregate Waste Superhub before January 5th deadline

From Railway Terraces Residents' Association:

Additional documents were put on the Barnet Council Planning Portal LINK just before Christmas regarding the proposals for the aggregate waste site at Cricklewood Railway Yard behind 400 Edgware Road.

Railway Terraces Residents' Association and Fordwych Residents were quickly off the mark asking members to submit additional comments before the January 5th deadline.

So far there have been 718 comments with 713 objections and two in support. The facility would be open from 7am-7pm on weekdays and 7am to 2pm on Saturdays.

Comments can be made on the Planning Portal LINK or by emailing planning.consultation@barnet.gov

The proposal:
Use of railway land for the transportation of aggregates and non-putrescible waste (construction) by rail including dismantling and removal of lighting tower; levelling of site and provision of landscape bund; 2no. open stockpile areas each containing 10 storage bins (with detachable panels) and 2no. partially enclosed stockpile areas each containing 9 storage bins (with detachable panels); acoustic and perimeter fencing; CCTV, security hut, 4no. welfare buildings, 4no. weighbridges and associated control cabins, 2 no. wheel wash facilities, dust suppression system, drainage, parking for HGVs and cars, traverser road, replacement rail track sidings, continued use of existing building for staff and welfare facilities; and other infrastructure and ancillary works including alterations to the existing access to Edgware Road and provision of new landscaping