Hot on the heels of my story about concrete blocking the main sewer in Wembley High Road
LINK comes a warning about major works resulting from the blockage circulated by Rubie Charalambous, Wembley and Ealing Road Town Centre Manager.
|
Click on image to enlarge |
URGENT WORKS -High Road, Wembley -
Blocked Sewer - Eastbound Road Closure 2/11/17 to 30/11/17
The Sewer on High Road, Wembley is
blocked near the junction of Ecclestone Place and unfortunately deep excavation
works are required to rectify the problem.
High Road, Wembley will be closed to
eastbound traffic from the junction of Park Lane. Traffic will be diverted via
Park Lane and Wembley Hill Road, a signed diversion will be in place for the
duration of the works.
Westbound traffic will continue to use
High Road, Wembley as normal.
The impact to the road network in the
Wembley area is expected to be severe, especially in peak times. Where possible
please avoid the area.
Unfortunately this period coincides with a number of events at Wembley Stadium although Spur's Real Madrid fixture at 90,000 capacity just squeezes in the day before the works start:
-->
Wednesday 1/11/2017 19.45 Tottenham
Hotspur v Real Madrid (UEFA Group Stage)
Sunday 05/11/2017 12:00 Tottenham Hotspur v Crystal Palace
Friday 10/11/2017 20.00 England v Germany
(Friendly)
Tuesday 14/11/2017 20.00 England v Brazil
(Friendly)
Saturday 25/11/2017 15:00 Tottenham Hotspur v West Bromwich Albion