Monday, 17 August 2015

Update on future of Welsh Harp Education Centre

Harry Mackie with a class at the Centre
I was a little worried when passing the Welsh Harp Environmental Education Centre at the Welsh Harp recently as it appeared to be somewhat neglected with one of the ponds dried up. More so when I discovered that the Centre's office had closed and the computers taken away.

Harry Mackie (pictured with a class above) who has been running the Centre for years retired at the end of term. Known to generations of Brent children he retired without fanfare or fuss.

His contribution to environmental education in Brent deserves wider recognition.

That aside, I have since heard that following the advertisements for the sale of the lease, that Carey's (operating in Brent under the name Seneca) charity arm  The Careys Foundation LINK and the Thames21 charity LINK have expressed an interest in running the Centre. Thames21 is already known in Brent through its work with schools and organising community cleanups of our many waterways. Achieving a base in Brent would make sense to their operation.

The Welsh Harp reservoir on Sunday afternoon
Debbie Leach, Chief Executive of  Thames21, told me that the WHEEC was a 'fantastic facility', that they would want to continue, develop  and enhance.  This could mean more activities connected with the Welsh Harp reservoir itself. They would work with local schools, and any other partners in this process.  Discussions with Brent Council are ongoing.

She said it was 'too early to say' if this could mean a joint partnership with Careys Foundation.

Siobhan of Careys Foundation said, 'I can confirm Careys Foundation did tender for the WHEEC but at this time I am unable to comment as the tender process is still live until the final decision by the Cabinet in September. It has been a privilege for Careys Foundation to have had the opportunity to support sucj a wonderful initiative as the WHEEC since 2011.

I understand that Oakington Manor Primary School  and Roe Green Junior School did not put in a bid but they were keen to work with Careys.

This means that another Brent Council facility will go over to the charity sector.

Provisional bookings had been made for Autumn Term which starts next month but it is not clear how keeping the schools informed of whether these will go ahead will be managed with no office in existence.

A report on the future of the Centre is due to go to Cabinet on September 21st.

Friday, 15 May 2015

Welsh Harp Centre to be leased out by Brent Council


Readers will remember that as part of their cuts Brent Council proposed to close the Welsh Harp Environmental Education Centre and a campaign was mounted to keep it open. LINK

We were told that alternative sources of management and funding were being sought including a possible funding agreement with Careys, the parent company of  waste processing company Seneca, which is based behind Wembley Stadium. Careys has extensive property in the area and has its own charity arm. At present they fund an additional teacher at the Centre. Oakington Manor Primary and Roe Green Juniors were also mentioned as having an interest in the continuation of the Centre.

The above advertisement appeared in the Brent and Kilburn Times yesetrday and rang alarm bells.  I have therefore sent the following message to Brent Council:
I refer to the advertisement in the Brent and Kilburn Times Ref: JXH/609/121. (attached)

I would be grateful if you could send me a copy of the Drawing referred to in the notice plus a response to the following questions:

1. How long is it envisaged that the lease to land and premises, including the office in Planet House will last?
2. Is it envisaged that the use of the land and premises will remain for educational purposes?
3. Is the land in question consecrated land subject to any change of use being agreed by the Diocesan of London? (see http://wembleymatters.blogspot.co.uk/2009/11/could-this-let-welsh-harp-rest-in-peace.html)
4. Is it intended that the building and land be leased to one of the following (or a combination): Carey's charity arm, Oakington Manor Primary School, Roe Green Junior School?

Many thanks,

Martin Francis
See below a copy of the drawing as requested above:


Thursday, 8 January 2015

Time to Save the Welsh Harp Environmental Centre yet again!



I don't really have to set out the case against the closure of the Welsh Harp Environmental Study Centre as Brent Council does it for me in the promotional video above.

The Centre has been threatened with closure on a number of occasions and each time schools, young people and former users, as well as environmentalists, have come to its defence. LINK

Thought to be in the 1980s
February 2011
The projected savings for closing the Centre are small £13,000 in 2015-16 and £14,000 in 2016-17. Current projected expenditure is £36,102 and projected income £23,000 (the Centre charges per head).

The Officer's report LINK suggests that Carey's, who currently fund one teaching post, might be interested in 'a greater role which could keep the centre open'. Carey's is the parent company of Seneca the waste materials reprocessing company sited between Wembley Park and Neasden.

Saturday, 3 November 2012

Brent Council wants to make money from recycled materials

Brent Executive is to consider a proposal to remove the processing of dry recyclable (blue bin materials and deposit banks) from Veolia's current contract in order to reduce costs and make money from the sale of the materials. An officers' report points to Harrow's success in this area but notes:
However, Brent is unlikely to be able to achieve financial outcomes as good as Harrow, because Harrow’s local circumstances give them particular advantages. Their collections are made ‘in-house’ and the waste is transferred to their own depot and handled by their own operatives. Although they incur costs in doing this which must be offset from the income received, they do not rely on the intervention of a ‘middle-man’ as Brent must do through Veolia. Veolia’s costs of handling the collected waste at their depot must still be met. 

Veolia have previously indicated this accounts for the greater part of the present gate fee. Nevertheless, each £1 reduction in this fee this represents a betterment to the Council of between £18,000 and £21,000 before any further benefit is generated from the sale of the material.

To enable this, officers must extract the processing element of the service from Veolia, i.e.make a switch from their MRF at Southwark and reach agreement with a separate third party for the receipt and processing of the waste they collect. Veolia have previously indicated they would not resist this approach, but this must be confirmed through consultation.

The council expects to collect a minimum of 18,500 tonnes of dry recyclable waste in 2012/13, rising to around 21,000 tonnes in 2013/14. At the present level of gate fee this will cost £407,000 rising to £462,000. The objective of this procurement exercise is to reduce that cost significantly.

To enable this, officers must extract the processing element of the service from Veolia, i.e. make a switch from their MRF at Southwark and reach agreement with a separate third party for the receipt and processing of the waste they collect. Veolia have previously indicated they would not resist this approach, but this must be confirmed through new negotiation.
There has been no comment from Brent Council on the collapse of the 4 borough public realm contract which include recycling and waste management but there are clear implications for this proposal. It is interesting to note the advantages that accrue to Harrow from having the service 'in house' and that is something Barnet has also decided to do.  There is already a local MRF in Brent, Seneca/Careys based between Wembley and Neasden who attracted criticism in the summer for the Neasden stink.The demand and price of recycled material is subject to extreme fluctuations and also subject to the extent of contamination from co-mingled collections.

Monday, 22 October 2012

Waste and the Wembley Plan - some reservations

As residents of Ealing and Brent in the area around Willesden Junction station fight a planning application for a 'waste to energy' incinerator on the Freightliners Depot site, readers may be interested in Brent Campaign Against Climate Change's submission on the Wembley Plan. This includes references to waste processing. Wembley was of course the site of the 'Wembley Stink' during the Olympics when the stench from rotting organic waste at the Seneca Materials Recycling Facility became a national issue.

Since this response was submitted the Brent Executive have agreed plans for the purchase of a site for a new waste management depot in Brent as part of the four-borough contracts for waste management, recycling, street sweeping and parks maintenance. £6m has been allocated and one wonders if the site will be in the Wembley Plan area.

Brent Campaign Against Climate Change – submission on Wembley Plan


We have limited our comments to the most relevant aspects of the Plan. Omission of comment on other areas neither indicates agreement, nor disagreement, with those proposals.

VISION OBJECTIVES (p13)

  • To preserve open spaces for recreation and biodiversity and create new and enhanced open spaces to address deficiencies where possible, but particularly to meet the needs of additional population commensurate with current levels of provision. AGREED
  • To increase the amount of public open space (at least 2.4ha within Wembley) and the amount of land with enhanced ecological value. AGREED
  • To enhance green and blue infrastructure by tree planting, returning rivers to their more natural courses and mitigating the pollution effects of development. AGREED
  • To achieve sustainable development, mitigate & adapt to climate change. AGREED
  • To reduce energy demand from current building regulation standards and achieve exemplar low carbon schemes and combined heat and power plants. RESERVATIONS SEE BELOW
  • To create a well-connected and accessible location where sustainable modes of travel are prioritised and modal share of car trips to Wembley is reduced from 37% towards 25%. AGREED AS A START BUT NEED TIMELINES FOR MORE AMBITIOUS TARGET
  • To promote access by public transport, bicycle or on foot and reduce car parking standards because of Wembleys relative accessibility AGREED
Wembley Area Action Plan - Preferred Options 13

Business Industry and Waste

  1. We are in favour of strict controls on waste management and processing sites in the entire area, rather than the limited area proposed. We would also favour relocation where that is possible. The events over the summer regarding the Seneca MRF and the ‘Wembley stink’ should serve as a warning for the future.  The Neasden/Wembley area already suffers from severe air pollution problems with school pupils particularly at risk because of the impact of air pollution on their smaller lungs. Chalkhill Primary, St Margaret Clitherow Primary, Northview Primary, Oakington Manor Primary and the proposed new Wembley Stadium Primary in Fulton Road are all in the vicinity. Older people also suffer disproportionately from respiratory problems.

  1. We propose the creation of a Green Enterprise zone in the area with a concerted effort by Brent Council, in conjunction with the College of North West London, to bring green training, apprenticeship and jobs into the area. At present aside from the building jobs associated with regeneration there is an over dependence on the creation of jobs in retail and leisure. Green jobs would make a significant contribution to the upskilling of the Brent labour force.

Response to Climate Change

  1. We welcome the inclusion of a response to Climate Change in the report and note this statement from the Wembley Plan:
10.6 Climate change will have a significant impact on the economic, social and environmental well being of Wembley. Hotter summers will have a bigger impact in Wembley because of the predominance of concrete and buildings. Heat waves will mean more people are likely to suffer from illnesses and could also lead to damage to roads, railways and buildings. Heavy thunderstorms and intense winter downpours will become more common, and will lead to flash flooding where the drainage system cannot cope with the increased rainfall. It is therefore crucial that future development in Wembley addresses these impacts and limits its contribution to climate change by minimising carbon emissions.
10.7 Specific issues for Wembley include the legacy of industrial use in the area which led to a lack of green and cool spaces. Much of Wembley is deficient in open space and there are few mature trees. Land adjacent to the Wealdstone Brook is most at risk of flooding, although much of Wembley is also prone to surface water flooding. In addition, the majority of the sewer network in the Wembley area is undersized.

2.       We welcome the recognition of the importance of this issue and that fact that it is being addressed in detail by the Council. We welcome the proposals on naturalising of the Wealdstone Brook, flood plain storage, tree planting, green roofs and creation of new parks are all welcomed as  responses to this situation.

Climate Change Mitigation

1.       Under this heading the Council make a number of proposals for Decentralised  (CHP) Combined Heat and Power facilities and for Energy from Waste over which we have reservations.

2.       The  reservations below regarding CHP are pertinent: and should inform the Council’s plans: (From  www.arthurshumway.smith.com)
 "Combined Heat and Power" (CHP) or "cogeneration" systems for producing both heat and electric power are generally mature and really can reduce emissions of CO2 compared to other fossil-fuel technologies. But there are two problems with typical discussion of CHP:

(1) Fossil-fuel-based CHP cannot be a long-term solution on climate or energy because they still burn fossil fuels, and therefore still emit a lot of CO2. Reducing that by 20% or even 50% is not enough; we need to take steps that over the next 30-40 years will bring fossil CO2 emissions close to 0.
(2) Efficiency claims for CHP systems are frequently greatly overstated. Heat is lower-quality energy than electricity, and only at high temperatures does it become close to comparable. Efficiency claims for CHP systems that use high-temperature heat are not so far off, but CHP systems that make use of low-temperature waste heat have much lower thermodynamic efficiencies than usually claimed.

The inflated efficiency claims often lead to assertions that CHP is the "largest" or one of the largest potential solutions. But the number of applications that require high-temperature heat where CHP efficiency really is quite high are limited. And the modest efficiency gains with low-temperature waste heat use, which could be much more widely applied, don't lead to very much improvement in overall energy use. The combining of heat and power production in CHP systems can reduce our fossil CO2 emissions by a few percent, but much more than that is needed in coming decades.

3. The Wembley  Plan (WEM 33) supports Energy from Waste and again we have reservations.

3.i The first issue is that the emphasis should be on the reduction of waste at source in manufacturing,  then re-use and recycling. There is a danger that in using residual waste as fuel in order to reduce landfill, the incentive to reduce waste is removed. Furthermore, dependence on waste as fuel to generate heat and power, can lead to the need to import fuel in order to keep the processes going. The NABU Study (2010) in Germany illustrates this:

The study shows that in 2010, somewhat less domestic waste will be produced in Germany than at present.. This is due to a decline in the population and a slight increase in recycling. Overcapacities with incinerators are already occurring. This applies to combustible material used in energy from waste plants as well as conventional incineration   
At this point in time, 2 million   more tonnes  of waste are imported into Germany than exported. This is equivalent to a goods train 1000 km in length. Germany is therefore a net importer of waste

We would not want Brent to become an importer of waste in order to fuel our EfW plants.

3.ii  Secondly, the Plan states ‘There are a number of new and emerging technologies that are able to produce energy from waste without direct combustion’ . Our reservation on this is that in some technologies the initial stages do not involve combustion but further stages involve, for example, gases being burned off..  We cannot pretend to be expert on these issues but urge that complete transparency, independent expert advice (rather than assurances from the companies involved) and public debate must take place before any such technologies are employed.

3.ii In investigating the detrimental impact on human health the Council must take into account the concerns that exist over nanoparticles  produced in the incineration process and the emerging science discipline of nanopathology that studies the impact of such particles on the human body.


Food Growing

1.       We welcome the proposal to include food growing areas in new development (WEM 38) and the use of temporary vacant spaces. However we do not agree to the claim that restricted space means that such spaces cannot be provided in any new schools in the area. Raised beds do not take up much space and there are many imaginative solutions involving containers, window boxes, growing walls etc that could be incorporated into new build. In addition the growing spaces in existing schools in the area show what can be done. Provision of demonstration food growing areas in newly created parks would be useful as well as support for finding food growing spaces alongside the Chiltern/Metropolitan and Jubilee  railway lines.

2.       Food growing in schools raises awareness of the children about the impact of climate change and encourages healthy eating and a long term interest in gardening. It links with the curriculum and awards such as Healthy School and Eco School. The Council should be vigorously supporting it and making every effort to find food growing space for children.

3.    The Metropolitan Housing Trust is already working on these issues on the Chalkhill Estate with residents and are seeking additional growing spaces on the estate Involvement of other housing providers should be sought.





Friday, 5 October 2012

Seneca chief apologises for Wembley stink

Part of the Seneca mural on its NeasdenMRF
John Carey Junior apologised at the Wembley Connects event this week for the stench that hung over the Wembley and Neasden area for more than a week over the summer, coinciding with the Olympic Games events at the Stadium and Arena.

Seneca,  which has an MRF (Materials Recycling Facility) in Hannah Close, was contrite. The company  has prided itself on its environmental credentials with parent company Careys part-funding the Welsh Harp Environmental Study Centre.

They admitted to management problems as well as technical ones and admitted that the incident led to 5,000 extra tonnes of waste going to landfill. The smell worsened when the pile of waste was disturbed to be shipped out to landfill by a fleet of lorries.

 They blamed the initial problem on the accumulation of organic waste from black bag collections in municipalities other than Brent, where there were not separate composting collections or where there were no facilities for these in flats. The manager responsible had been 'let go', and organic waste was now being turned around within a 24 hour period, rather than festering on site. Odour repressants had been fitted and the odour extracted from within the building.

In response to questions Seneca confirmed that they were seeking a rail connection to transport waste materials (the site is next to the Chiltern Line) and that plans for a biomass plant were planned to go ahead but had been delayed when Seneca's partner went into liquidation.

The Environment Agency in a  briefing dated October 12th and distributed at the meeting said:
We are currently considering our enforcement options. This is  a live investigation and because of legal sensitivities, we are not able to discuss how the investigation is progressing. We will of course keep in touch with people who contact us and ask to be kept informed when we can say more. 

We have received a number of late reports of odour during recent weeks. We would ask that the local community immediately contact us on our 24 hour incident hotline telephone number 0800 80 70 60, if they smell odour which they believe is coming from Unit 2, Hannah Close.
In my contribution I reminded residents that there are a number of waste plants in the area and that Seneca was just across the railway lines from St Margaret Clitherow Primary School and Chalkhill Primary School. The proposed Wembley Stadium Primary would not be far away in Fulton Road. Brent Council had discussed the issue of the accumulation of such ' dirty neighbour' waste firms in the area in its Wembley Plan consultation. The consultation on the plan's preferred options closes on Monday October 8th. Residents who are concerned should go to Brent Council's consultation portal HERE to submit their views.

The consultation closes at 17.00 on Monday.

Sunday, 19 August 2012

Now tube bosses kick up a stink about Wembley stench

The Brent and Kilburn Times reports that Jubilee Line bosses are now calling for action on the Wembley-Neasden Stink from Seneca's MRF , following complaints from passengers.

LINK

Seneca's publicity video below shows how close the Materials Recyclign Facility is to the railway line. Seneca hopes to build a biomass plant there in the future.

 

Thursday, 9 August 2012

Stink over Wembley Olympics

We were warned  that clearing the problem at Seneca's Hannah Close Materials Recycling Facility may result in the smell worsening for a short time and that was certainly true this evening.

Olympic passengers on the Jubilee line train I was travelling on sniffed the air as we left Neasden and started giving each other surreptitious  funny looks.  Noses were screwed up, eye brows raised and faces pulled as it dawned on them that perhaps it wasn't a single anti-social individual causing the stink.

Perhaps the driver should have made a public announcement to pre-empt any misunderstandings!

Seneca and parent company were given until tomorrow (Friday) by the Environment Agency to deal with the source of the putrid smell.

Monday, 6 August 2012

Neasden stink source is Seneca


I can reveal that the stink reported over the weekend between Neasden and Wembley Park emanated from the Neasden recycling yard of Seneca. The Environment Agency has given Seneca until Friday to clear it up but there are warnings that the smell could get worse while this happens.

Seneca, a subsidiary of Careys, was given planning permission by Brent Council for a Materials Recycling Facility on the site, despite concerns about the number of waste facilities in the area. Latterly the Wembley Plan consultation mentioned the impact of 'bad neighbour' waste processing and handling firms in the area on potential redevelopment, including the possibility of a new primary school in Fulton Road.

Seneca is named after the Roman philosopher and politicam 5BC-65AD. One of his popular quotations is...
Be not too hasty either with praise or blame; speak always as though you were giving evidence before the judgement-seat of the Gods.
...so I had better be careful. However it is worth pointing out that Seneca's parent company, Careys, was much praised by ex-Brent Council leader Ann John, when they stepped in to help save the Welsh Harp Environmental Education Centre.



Next year the procurement process will start for a new Brent Waste Contract worth millions of pounds. The contract for waste collection and recycling and street cleaning is presently held by Veolia. The new contract may also include park maintenance.
The Environment Agency can only work if they get information/ complaints from local people . You can speak to them on 0800 807060.

Friday, 20 July 2012

Wembley's re-cycling graffiti wall ready for Olympics

Readers may be interested in this press release from Seneca, a subsidiary of Careys:

Waste management company Seneca has unveiled a 508-foot long recycling–inspired mural at its materials recycling facility (MRF) in Wembley, North West London, in a bid to tackle a graffiti problem at the site.

The company was approached by the Brent Graffiti Partnership, which includes Brent council, British Transport Police, Network Rail and the Brent Police, to address problems it had been having with vandals spray painting the side of its materials recycling facility (MRF), after it opened in May 2011.
A series of recycling-inspired images have been installed to tackle the graffiti problem at Seneca's Wembley MRF
A series of recycling-inspired images havebeen installed to tackle the graffiti problem at Seneca's Wembley MRF
The facility processes residual waste collected from the West London Waste Partnership, and produces refuse derived fuel that is exported to Europe.

Graffiti

On researching the issue Seneca discovered that graffiti artists consider it bad manners to tag or paint over someone else’s art, and so the idea of creating a street art mural was chosen as a suitable solution to the problem, with all the artwork created using spray paint and stencils.

Artists from across the globe as well as school children from from Harlesden Primary School, Barham Primary School, St. Robert Southwell Catholic Primary School, Roe Green Junior School, Gower House School and Vernon House School have contributed designs and artwork to the project, which includes a sculpture made entirely from material received at the MRF.

The mural overlooks the Jubilee and Metropolitan London underground lines running between Neasdon and Wembley Park and is created entirely from spray paint and recycled materials.

Unveiling the mural, Michael McLarnon, operations manager at the Seneca MRF, said: “The project was created after we had been approached by Brent council’s Graffiti Partnership. The MRF has been targeted by vandals and with the Wembley area highlighted because of the Olympics we thought it was appropriate to do something that engaged with the local community.

“We came up with the idea to create the mural and we are honoured to have artists come from all over the world to take part in this worthwhile project.”

Mural

The mural has taken over 6 months to create, and is thought to be one of the largest outdoor art installations in Europe.

Simon Egbor, Brent council community safety project officer and member of the Graffiti Partnership Board said: “Over three years ago graffiti crime was costing the council in excess of £400,000. This was a real problem and the formation of the Graffiti Partnership Board has managed to focus both council and external partners in not only cleaning graffiti but setting up operations to identify graffiti vandals and enforce action.

“We approached Seneca with this idea as the use of murals in graffiti hot spots has proven to be a successful deterrent. This is illustrated by past murals that we have commissioned including one on Harley Road, Harlesden.”

Monday, 18 July 2011

A look at Hannah Close, possible new waste site

My curiosity led me this afternoon to have a stroll around  the back of the stadium to see where a possible recycling plant might be sited in Hannah Close. Careys, the local company who helped save the Welsh Harp Environmental Centre, has a lot of property in the area along with their waste management subsidiary Seneca.

Seneca's  security guards were worried about me taking photographs and denied that the company had anything to do with Careys. The Jubilee and Metropolitan lines run behind the site and on the other side is St Margaret Clitherow Primary School and residential streets which include Quainton, Verney, Aylesbury Chesham and Village Way.


Hannah Close, and Atlas Road which it joins, already have several recycling sites:


The River Brent runs flows to Hannah Close and runs beneath the railway line. Wembley Brook is also close by. Campaigners in Ealing have been concerned about possible contamination of the River Brent if new waste processing facilities are built and there must be similar concerns in Wembley.

The following photograph was taken today with waste fluid apparently flowing from Harringtons in Fourth Way.


A further concern is the proposal, in the Wembley Masterplan, to open up North End Road and join it again to Bridge Road in Wembley. At present North End Road is closed where it meets Atlas Road. If it was opened up and joined to Bridge Road a route would be established to the recycling facilities in Hannah Close, via Atlas Road, increasing lorry traffic past the Danes Court and  Empire Court flats, which at present are a peaceful haven despite their proximity to the railway.

Sunday, 26 June 2011

There's money in muck


With landfill sites rapidly being filled and the tax on landfill rising to £72 per tonne in 2013 local authorities are desperately looking for solutions. Rather than action on reducing waste in the first place, which many local authorities see as the responsibility of government, the emphasis is instead on recycling which is where big business enters the picture. There is a central contradiction here because the more that can be recycled the more money the waste contractors makes, while the more the overall amount of residual waste can be reduced the less they will make.

Presently the West London Waste Authority, covering Brent, Ealing, Harrow, Hillingdon, Hounslow and Richmond is in the process of awarding a 25 year contract for waste management which could be worth up to £485m (the estimated cost of continuing landfill at present rate). The bidding process is under way and the preferred bidder will be selected in 2013.  There has been controversy over because during public consultation potential waste processing sites were selected, many in Park Royal, without any details of the processes that would take place, raising fears about possible pollution from incinerators. There have been public protest meetings in Ealing about this issue but little action in Brent.  Cllr James Powney is our borough representative on the WLWA.

A similar process for long-term contracts has taken place in South London and North London Waste Authority selected the following bidders in April 2011:
  • FCC Skanska (Formento de Construcciones y Contratas SA and Skanska Infrastructure Development UK Ltd) (consortium)
  • SITA/ Lend Lease (SITA UK Ltd and Catalyst Lend Lease) (consortium)
  • Veolia ES Aurora Ltd. 
The North London proposals have run into  trouble over a proposed plant at Pinkham Way in Haringey, on the border with Barnet and Enfield, with residents concerned about noise, congestion and pollution as well as the building itself. LINK  In South London, Croydon Green Party has been involved in a campaign against a proposed plant which they believe is really an incinerator:


In Brent itself the waste management contract with Veolia has been amended with some difficulty ahead of the new waste management strategy that starts in October 2011. Brent Council's contract with Veolia ends in 2014 and there will be a new bidding process to ensure best value. This process will be overseen by Cllr James Powney.

Veolia, a likely bidder for both contracts, is French multinational with a wide spread of interests including water (in north Brent it previously went under the names of Three Valleys Water), waste management and transport. It has been embroiled in controversy over its activities in the Palestinian territories occupied by Israel which include a light rail system and waste management. Campaigners argue that Veolia is complicit in human rights violations. LINK

Despite this Veolia is seen to be in a favourable position for both contracts because of its possession of a depot in Alperton and a potential site for waste processing.  However,  Careys, a local company, set up an 'environmental solutions' company in February and named it after the Roman philosopher, Seneca, who is famous as a Stoic. The company newsletter even quotes Seneca: 'Every new beginning comes from some other beginning's end'. Brent Council granted Careys planning permission for a 'super materials recycling facility' at Hannah Close in Neasden (below) in October 2010 with very little publicity and no response from environmental groups including the Green Party. The plant will process 1.1m tonnes of construction and demolition, business and household waste each year. By 2013 an energy producing 'wood biomass facility' will be operational which clearly raises issues over potential pollution.

The Seneca (Careys) plant in Neasden
In March 2011 Careys secured a public relations coup by agreeing to save the Welsh Harp Environmental Education Centre which had been threatened with closure due to local government cuts. They will pay half the revenue costs for the next two years which I understand is about £50,000. Brent Council leader Cllr Ann John took part in a photocall with John Carey at the Centre. LINK

Further information on these issues:
West London Waste Monitor
 UK Without Incineration Network
Brent Friends of the Earth