Well, here's a dilemma!
The Brent and Kilburn Times is reporting LINK that the Willesden Junction site ear-marked for an incinerator may be required by HS2 to transport waste from nearby tunnelling operations.HS2 under its safeguarding rights would have prior claim to the site.
Brent Greens are opposed to both the incinerator proposal and HS2 - perhaps we should campaign for a much needed green space on the site or an Alternative Technology Centre
The Brent and Kilburn Times is reporting LINK that the Willesden Junction site ear-marked for an incinerator may be required by HS2 to transport waste from nearby tunnelling operations.HS2 under its safeguarding rights would have prior claim to the site.
Brent Greens are opposed to both the incinerator proposal and HS2 - perhaps we should campaign for a much needed green space on the site or an Alternative Technology Centre