Brent opens consultation on sections of the Cycleway 72: Conduit Way, Stonebridge Park Station and Monks Park

The long awaited cycle link between Harlesden Station and Wembley Central Station takes a step (or pedal) nearer with a consultation on three sections. Click on the links for maps and full details.

  

Conduit Way https://haveyoursay.brent.gov.uk/en-GB/projects/conduit-way-cycleway-72-links-in


Summary:

  • 20mph Zone and traffic calming features – A new 20mph Zone is proposed Conduit Way, Durand Way, Wyborne Way, Sunny Crescent, Twybridge Way, Meadow Garth and Pramukh Swami Road along with sinusoidal (smooth stop) speed humps to reduce vehicle speeds and the severity of accidents.
  • Junction improvement – The existing mini-roundabout at the junction of Brentfield Road and Meadow Garth will be removed and replaced with “give-way” priority junction and raised speed table.
  • Upgraded pedestrian crossing – A new parallel crossing (for use by pedestrian and cyclists) is proposed at the junction of Brentfield Road and Meadow Garth. This will improve priority and accessibility for both pedestrians and cyclists.
  • Raised entry treatments – Raised speed tables are proposed at side roads junction with Conduit Way to reduce vehicle speeds and increase accessibility for pedestrians.

 

Additional greening – Additional trees and greening are proposed to improve the public realm along the length of the cycleway connection.

 

 


   

Stonebridge Park Station https://haveyoursay.brent.gov.uk/en-GB/projects/stonebridge-park-station-cycleway-72-links-in

 

Summary 

  • New parallel crossing and cycle connection – A new footway, cycle track and parallel crossing (for use by pedestrians and cyclists) are proposed on the eastern side of Old North Circular Road to connect existing cycling facilities with Cycleway 72.
  • Upgraded pedestrian crossing – A new zebra crossing is proposed at the entrance to Stonebridge Park station. This will improve priority and accessibility for pedestrians.
  • Junction improvement – The layout of the Argenta Way / Old North Circular Road junction will be improved by removing the existing traffic splitter and tightening the corners.

 

Additional greening – Additional trees and greening are proposed to improve the public realm along the length of the cycleway connection.

   


  

Stonebridge Park Station https://haveyoursay.brent.gov.uk/en-GB/projects/stonebridge-park-station-cycleway-72-links-in

 

Summary 

  • New parallel crossing and cycle connection – A new footway, cycle track and parallel crossing (for use by pedestrians and cyclists) are proposed on the eastern side of Old North Circular Road to connect existing cycling facilities with Cycleway 72.
  • Upgraded pedestrian crossing – A new zebra crossing is proposed at the entrance to Stonebridge Park station. This will improve priority and accessibility for pedestrians.
  • Junction improvement – The layout of the Argenta Way / Old North Circular Road junction will be improved by removing the existing traffic splitter and tightening the corners.

 

Additional greening – Additional trees and greening are proposed to improve the public realm along the length of the cycleway connection.