Showing posts with label Barnet Planning. Show all posts
Showing posts with label Barnet Planning. Show all posts

Sunday 7 April 2013

New threat to Welsh Harp - time to act quickly

The view today from the west bank of the Welsh Harp
The view in the future if the development goes ahead
Four years  ago a united campaign of local political activists and environmentalists saw off proposals for housing developments in both Barnet and Brent areas of Brent Reservoir, popularly known as the Welsh Harp.

Those proposals are dwarfed by the enormous West Hendon development proposed by Barratts which is soon to be considered by Barnet Council.


The development is adjacent to an SSSI (site of Special Scientific Interest) on the Welsh Harp which is home to nesting birds and used by over-wintering birds.  It draws visitors from all over London and beyond. The footpath is well used by many Brent residents who start their walk at the Birchen Grove end of the Welsh Harp.

The development will include tower blocks of up to 26 storeys high - double the height of the one in the photograph.The existing 597 homes will be demolished and replaced by 2,000 houses and flats including 4 tower blocks. There are proposals to build footbridges over the Silk Stream and beside Cool Oak Bridge which are likely to cause water pollution during construction. The area is already one designated as having poor air quality and the development is likely to increase traffic in the area.

Barratts have already built a 12 storey block next to Cool Oak Bridge which gives an indication of the overbearing nature of such blocks and the extent to which they rise above tree height. The new blocks will be twice as high.


There is some confusion about the date by which letters have to be received by Barnet Planning Officers, the safest assumption is that the deadline is April 30th. The Planning Reference is H/01054/13 and the Barnet Planing contacts is: Thomas.Wyld@barnet.gov.uk 

Full documentation can be found HERE

I reproduce below a submission on the development that sums up the issues very well:

Comments on West Hendon re-development Proposals



Significance of Northern Reservoir/Refuge/Marsh and associated woodland.

The Northern reservoir is an important refuge used by wildfowl when there is disturbance on the main reservoir from sailing. It functions this way throughout the year but especially during the winter months when the normal numbers of birds increase by several hundred displaced ducks and other wildfowl. The area most used by these birds is along the bank next to the estate. It is a SSSI which should afford a high level of protection under wildlife legislation. An important screen of trees currently separates the water from the estate. The marshy northern end of the water is also important for breeding wildfowl in the sheltered pools and channels. Finally at the northern end is a quiet area of wet woodland in which a number of shy woodland birds breed (owls, woodpeckers, warblers). The area of the re-development abuts the whole of the edge of the waterway, marsh and woodland.



Proposed re-development- key features

The proposal involves a huge increase in the density of housing and greatly exceeds the GLA recommended level for a site of this size increasing from 7-800 housing units to over 2000. A key feature of the proposal is the construction of a number of extremely high tower blocks, up to 26 stories in height; these are sited immediately adjacent to the Water and the SSSI boundary. The excessive height of these towers seems more appropriate for a central financial district than a North London suburb. The development will have a major impact on the surrounding area and put a huge strain on local health, education and road infrastructure.



Impact on the SSSI, reservoir and local area

  • There will be a major increase in disturbance of the wildfowl refuge both during construction and when occupied, both due to the excessive height of the buildings and the tripling of the number of occupants
  • The developers would like to remove tree screening to open up sight lines. This will make matters worse and increase disturbance. We can expect that this will have a major impact on roosting and nesting birds. The existing tree buffer hides all but the single 15 storey tower that currently exists and in addition to increased disturbance any reduction in the tree cover will have a major and detrimental landscape effect when viewed from the bridge or the footpath to the west of the north reservoir. The tree screen needs to be effectively managed and maintained.
  • There will be a large increase in the amount of night-time light pollution in what is currently a dark area. This will affect birds and mammals such as bats. External night-time lighting of the towers must be kept to a minimum. Brightly lit towers have been shown to have a detrimental effect on night flying and migrating birds
  • The extreme height of the tower blocks will interfere with flight lines for birds trying to get away from sailing disturbance on the main reservoir. There could also be an increased risk of bird strikes made worse by the large number of high level glass windows.
  •  A proposed bridge and circular route crossing the river further upstream will disturb and damage the wet woodland where shy woodland birds such as woodpeckers, owls and warblers breed. This woodland forms part of the SSSI buffer and Local Nature Reserve.
  • This proposed bridge will also disturb scarce breeding wildfowl such as Gadwall, Pochard and others which breed in the pools and reed-beds at the end of the reservoir next to the woodland.
  • The proposed location of the towers next to the SSSI boundary appears to be mainly for commercial and marketing reasons and has little regard for the nature reserve. They should be lower and further back.
  • Due to the huge increase in occupancy of the estate there will be many more people visiting the lake and therefore greatly increasing the disturbance. The planned occupancy level greatly exceeds the level proposed for the site by the GLA.
  • The provision of car parking, schools and health centres appears inadequate for the level of occupancy. This will put great strain on local infrastructure, facilities and roads.
  • The two reservoirs have an important secondary function as a flood buffer. The huge increase in the local built footprint and areas covered by concrete will have an adverse effect on the carrying capacity in times of heavy rain. Flood events seem to be on the increase at the site from my own observations over a period of 30 years.
  • The SSSI boundary with York Park has long been a dumping ground for domestic appliances and waste. The huge increase in occupancy will clearly make this much worse.

Summary



This development will have a major and detrimental impact on both the Reservoir Nature Reserve and the local community. It is inevitable that the SSSI will be adversely affected.  The planned occupancy level needs to be greatly reduced to a level more appropriate to the area and the setting. The tower blocks should be reduced in height and placed back from the margins of the reservoir. The part of the development already completed shows the overbearing and inappropriate nature of the building design next to one of London’s most important sites for recreation and natural history. 


The local council, the owners (of the reservoir) and the developers have a legal duty under existing wildlife legislation to conserve and improve the SSSI. As the proposals stand it is impossible for them to achieve this aim and we can only expect deterioration in the standard of the SSSI.