Showing posts with label Watkin Road. Show all posts
Showing posts with label Watkin Road. Show all posts

Wednesday, 11 November 2026

You have until tomorrow to comment on 18 storey student accommodation block on Watkin Road, Wembley Park

The proposed block in centre of image

 From the Design and Access Statement by Claridge Architects for Seven Capital


As densification increases and every previous light industrial site is gobbled up for high rise developments in Wembley Park, existing residents are realising that their quality of life is being affected and have been getting organised.  The campaign for the retention of Samovar/Market Square open space is one part of that struggle and specific proposals another.

The replacement of two one storey workshops on Watkin Road by an 18 storey student block is encountering opposition and residents are being urged to object. The deadline for objections is tomorrow Thursday 12th November.


 

LINK TO OBJECT (Application 25/1759)

Your objection should focus on planning issues. You may wish to mention:

* Height and design: Whether an 18-storey building would be too dominant and overbearing for neighbouring homes and the surrounding area.

* Loss of light and overshadowing: How the development could affect daylight and sunlight reaching nearby homes and public spaces.

* Flood risk: Whether the proposal adequately addresses flooding near Wealdstone Brook, including future climate risks.

* Balance of development: Wembley Park already has several large student blocks. Consider whether this proposal provides the right balance of development and meets the wider community’s needs.

* Remember: Explain how the proposal could affect you, your neighbourhood or the wider community. Personal experiences and local knowledge can be very persuasive.




Saturday, 31 October 2026

Revised plans for 7-8 Watkin Road, now with 365 student beds in up to 18 storey building, now on Brent Council Planning Portal

 

From this....


 ...to this.

 

The fragments of light industry workshops  around Wembley Stadium are rapidly being demolished and replaced by high rise blocks. The latest proposals for 7-8 Watkin Road are now on Brent Council's Planning Portal (Ref 25/1759) and open for comment LINK.

The proposal is for an 18 storey student accommodation block with the accommodation increased to 365 beds and the original industrial provision drastically reduced:


It is worth going back to a discussion that took place during the last Labour administration of in its Planning Committee, then chaired by Cllr Kelcher, about the need to slow down the amount of purpose built student accommodation (PBSA) because of potential impact on community cohesion and the continuing need for housing.  See:     Student accommodation wins narrowly over local housing need at Brent Planning Committee

 The GLA was moved to issue guidance on the subject LINK

 

I am hearing that there are concerns from residents of nearby blocks about the dominance of the proposed building and the impact of high density and loss of light on their homes, although there are no comments record yet on the planning portal.

In the light of the recent Scrutiny debate on flooding preparation it is interesting to note that the Environment Agency had concerns. The Wealdstone Brook runs behind the site.


 The site is marked in red. The trees indicate the passage of the brook.

The developer in an Addendum notes;       

The Environment Agency (EA) raised objections to the original scheme. In the original EA consultation response dated 12 November 2025, it stated that the applicant should submit a revised FRA (Flood Risk assessment)  which addresses these points:

 

“Flood storage compensation

 

• Demonstrate that adequate flood storage compensation will be provided for the loss in floodplain storage capacity due to the increase in built footprint. The best way to compensate for flood storage loss is to recreate an area of floodplain that mimics the area, shape and volume of the section of floodplain that has been lost by the development.

 

Raised finished floor levels

 

• The applicant should submit evidence to demonstrate that the proposal will not pose a risk to life and/or property. This can be achieved through demonstrating that raised finished flood levels, as outlined above, can be provided to prevent internal flooding of the development and damage to people and property.”

 

To resolve the “flood storage compensation” element the following design changes have been made:

 

• The proposed basement included in previous proposals has been omitted.

• The proposed building footprint at ground floor level has been reduced such that the new building is no larger than the existing building footprint and there is therefore no reduction in floodplain storage.

 

To resolve the “Raised finished floor levels” issue, the following is proposed:

 

• A limited non-habitable internal area (forming a cycle store with level access to external areas) is provided at 31.00m AOD. The area is not proposed to be flood plain compensation as it sits within the existing building footprint, however, does sit nominally below the maximum flood level and will therefore be managed and constructed using flood resilient techniques.

 

The Addendum addresses the reduction in replacement industrial floor space was 1.032sqm to a token 99sqm and claims the site is not in a 'traditional industrial location':   

It is noted that the Site has locational constraints particularly noting its location near to Wembley Stadium. Resultantly, the Site is impacted by road closures arising from event days, which softens its appeal for larger format industrial spaces. The proposed development at 7-8 Watkin Road is not considered to fall within this Grade A market, as it is not in a traditional industrial location, does not comprise easy access for larger vehicles and suffers with event days restrictions at Wembley Stadium

 

The proposed 99 sqm of industrial floor space will provide a smaller, high-quality and genuinely occupiable industrial space, allowing the marketing of the unit to be targeted towards SMEs, creative industries and maker-space occupiers. This is as opposed to a larger quantum of floorspace of which may struggle to attract occupiers or remain occupied in the long term as ar esult of the Site's physical and operational constraints as outlined above and further detailed within the Revised Industrial Floorspace Report prepared by Levy Real Estate.

The impact on local views of the stadium, views that are supposed to be protected, can be seen from this example from Chalkhill Park, on the other side of the railway tracks:

 Current view


 Post-build, most of the arch disappears 

Anyone expecting to be able to sunbathe in Union Park North  has another think coming.  Pipeline proposals (black) and 7-8 Watkin Road (blue) that show a circle of tall builds that will limit sunlight.

 Engineers Way

Residents of the pleasant low rise flats in Empire Way will have a new neighbour with more to come:

View from Empire Court

 

All 171 documents for this application can be found HERE plus a tab on which you can comment.  Neighbourhood Consultation ends on 12th November 2026. 

Thursday, 10 August 2023

619 bed student towers in Wembley Park approved. Prospect House double towers in Stonebridge Park approved

 Student towers from Empire Court, North End Road

Consented towers are the blue images

Despite opposition from nearby residents who said they had not been consulted and would lose light and suffer ASB from students, the planning application for 619 bed student accomodation in Watking Road, Wembley Park, was passed by Brent Planning Committee last night. The committee were told there was demand for such accommodation from London colleges as well as the Football Business University in Wembley.  They were also told the provision would relieve pressure on other accommodation including HMOs  and would deliver the equivalent ot 247 units towards Brent's Housing target. Officers argued that students would support the local night-time and cultural economy.

 


A double tower on the site of Prospect House on the North Circular Road was also approved. The site is on a flood plain and framed by the River Brent and the Grand Union Canal, as well as the polluted North Circular Road.

The site has some dubious history worth reading in this article by Alison Hopkins. LINK


Saturday, 12 September 2020

Brent Planning Committee proceedings told in Tweets

 I tweeted proceedings of Monday's Planning Committee in real time and reproduce the three main items below to give you a flavour of the proceedings. The latest tweets appear first for each application.

The meeting started late, presumably this was the reason. Cllr Deneslow will be replaced at Monday's Council AGM by Cllr Kelcher.

 

CLAREMONT HIGH SCHOOL 3G PITCH
 

 


(Last tweet bove should be Claremont not Kingsbury. Kingsbury High School withdrew a similar application after opposition from residents)

BRIDGEWATER ROAD, ALPERTON

 

WATKIN ROAD, WEMBLEY PARK







Monday, 3 December 2018

Brent Council Planning Committee to decide on a 23 storey tower near Empire and Danes Court, Wembley

The development and others planned (grey shading) from North End Road
Before
After
Cumalative massing
Brent Planning Committee on December 12th will consider an application to build a block of varying heights, maximum 23 storeys, on a site in Watkin Road currently occupied by single storey car repair buildings. It is just outside the Quintain Masterplan site but illustrates the way tower blocks are spreading across the area.

At 23 storeys it is lower than the 29 storey Apex House student accommodation tower which will be its near neighbour. There is a 34 story block planned at Quintain Plot NE06.


The new building continues the enroachment on


As has become custome and practice the report by Brent planners glosses over aspects where the application fails to meet or comes close to not meeting local and London guidance:

  1. Provision of new homes and affordable workspace: Your officers give great weight to the viable delivery of private and affordable housing and new affordable commercial floor space, in line with the adopted Development Plan.
  2. The impact of a building of this height and design in this location: The proposal replaces a poor quality commercial plot with a large modern high density development in keeping with the surrounding and approved built form. The development utilises good architecture with quality detailing and materials in order to maximise the site’s potential whilst respecting surrounding development. The development will not obstruct views of the Wembley Stadium arch from any protected viewpoints. A “tall building” is proposed within an area designated as “Inappropriate for tall buildings”. However, the height, layout, design and massing has been carefully considered and has been evaluated by the Design Council Design Review Panel, the GLA and by Brent Officers who all have concluded that the proposed building is appropriate for this context.
  3. Quality of the resulting residential accommodation: The residential accommodation proposed is of sufficiently high quality. The mix of units is in accordance with the standards within the London Plan and reasonably well aligned with the Wembley Area Action Plan mix, and the flats would generally have good outlook and light. The amenity space is below our standard, but is still substantial and is high for a tall building.

  1. Affordable housing: The maximum reasonable amount has been provided
    on a near policy compliant tenure split. This includes 35% affordable housing provision with a tenure split of 60:40 between affordable rented and intermediate flats when measured in terms of habitable rooms. 48% of the affordable rented accommodation are 3 bedroom flats when measured in terms of habitable rooms. The viability has been tested and it has been demonstrated that this is the maximum reasonable amount that can be provided on site. The requirements of affordable housing obligations are considered to have been met and a late stage viability review will be secured by S106.
  2. Neighbouring amenity: There would be a loss of light to some windows of surrounding buildings, which is a function of a development on this scale. Many of the windows affected would serve student accommodation and/or do not yet exist as an established residential standard. The impact is considered to be acceptable given the urban context of the site. The overall impact of the development is considered acceptable, particularly in view of the wider regenerative benefits.
  3. Highways and transportation: The alterations to the public highway as required in the S106 would be acceptable, considering the needs of pedestrians, cyclists and motorists. The highway works will include (i) providing a new loading bay on North End Road and (ii) extending a 20mph zone alongside the building. To encourage sustainable travel patterns, the scheme will be 'car-free' with the exception of blue badge parking spaces. A financial contribution of £110,000 towards extending CPZ's into the area is proposed with the removal of rights for residents within the development to apply for parking permits. A for bus service enhancements in the area, as required by TfL, will also be secured.
  4. Trees, landscaping and public realm: Some low quality trees are proposed to be removed but they are not considered worthy of retention. The proposal is likely to substantially improve on the existing situation with a new public realm and associated tree planting proposed alongside a wider landscaping strategy. This will be assured through conditions.
  5. Environmental impact, sustainability and energy: The measures outlined by the applicant achieve the required improvement on carbon savings within London Plan policy. Conditions will require further consideration of carbon savings prior to implementation.
  6. Flooding and Drainage: Part of the site sits within a flood zone. A flood mitigation strategy and drainage strategy will be secured by condition to mitigate the risks associated with this. The development will also substantially improve the drainage capacity of the site through attenuation measures.
I would be interested to hear what the residents of Empire and Danes Court think of the proposal.