Showing posts with label Wembley Stadium. Tottenham Hotspur. Show all posts
Showing posts with label Wembley Stadium. Tottenham Hotspur. Show all posts

Thursday, 2 March 2017

Wembley Stadium events consultation deadline extended to March 9th

Brent Council appear to be trawling through submissions on their Planning Portal to correct those clearly against the Wembley Stadium increase in event days and removal of capacity cap, but that have been classifed by the software as 'Neutral'. LINK

There are now 108 on-line submissions.

Many residents have encountered problems posting their comments on line (This is the LINK).  The deadline has now been extended to March 9th, 2016.

As an alternative comments can be sent by email  to alice.lester@brent.gov.uk quoting 'Comment on 17/0368'. Remember to state clearly your position (Support/Object/Neutral) on proposed variation of Condition 3 and removal of Condition 33. Postal comments can be sent to Alice Lester, Planning Department, Brent Civic Centre, Engineers Way, HA9 0FJ.

Details from the Planning Application:

 CONDITION 3 OF THE WEMBLEY STADIUM PLANNING CONSENT – THE CURRENT EVENT CAP
This condition restricts the number of full capacity events (up to 90,000 people) held at the stadium each year to 37 until certain transport improvements* have been completed. There is no restriction on the number of events that can be held that only use the lower and middle tier of the stadium (up to a capacity of  approximately 51,000). The current restriction allows 22 sporting events and 15 non-sporting events (although 3 additional sporting events can be held provided the number of non-sporting events is reduced by2 for each additional sporting event).

* This restriction falls away once certain public transport and highway works are completed.Most of the works have been completed, including an increase in the capacity of Wembley Park Station and significant road improvements within the Wembley Industrial Estate. However, the upgrading of one element of road within the industrial estate required the purchase of a significant amount of land and this was not completed.

PROPOSED VARIATION OF CONDITION 3 – THE PROPOSED CHANGE TO THE EVENT CAP
The applicant proposes that this condition is varied to allow up to 31 additional full capacity major Tottenham Hotspur Football Club sporting events between 1 August 2017 and 31 July 2018 (events with a capacity of between 51,000 and 90,000 people).
(NOTE: These additional events could take place without any variation to the planning consent, under the existing cap, where capacity would be limited to up to a maximum of approximately 51,000 people).

PROPOSED REMOVAL OF CONDITION 33
Condition 33 restricts the number of times that traffic management measures can be implemented each year, with specific reference to North Circular Road traffic flow. The applicant proposes that this condition is removed, specifying that TfL consider the traffic management measures to have a positive impact on trafficflow within the North Circular Road.