Showing posts with label Carlton House. Show all posts
Showing posts with label Carlton House. Show all posts

Sunday 23 May 2021

HS2 vent next to South Kilburn primary school at Planning Committee tomorrow but its powers are limited

 

The development site outlined in red, school grounds in green and Canterbury House and Carlton House

A battle started about 6 years ago when Brent Council asked HS2 to site a proposed vent site for the high speed rail running underground at this point at a site next to a primary school in South Kilburn rather than one adjacent to Queens Park station.

In a  message to constituents, March 23rd 2016,  Tulip Siddiq MP said:

Today in Parliament, I voted against the High Speed Rail 2 (HS2) Bill that will devastate areas of Camden and Brent.

I have campaigned against HS2 for the past seven years as I believe it is an ill-thought out scheme that will lead to bedlam on our roads, disruption to the education of school children and a compromised local environment. (my emphasis)

Further, these plans will cost taxpayers billions of pounds. I believe this money could instead be spent on projects that will actually bring real improvements to living standards across the country.

Having spoken against this Bill at the Select Committee, and again in today’s debate, I’d like to take this opportunity to thank residents who engaged with the lengthy and costly petition process. Though the Bill received support from across Parliament, it is your voice that will force HS2 to fulfil its assurances to compensate and mitigate the worst of the impacts.

My first priority as the MP for Hampstead and Kilburn is to protect residents in Camden and Brent. Therefore, I am proud to have voted against High Speed Rail 2 today in Parliament.

The scheme have now been granted permission by parliament, but I will keep fighting for mitigation for constituents.

Of course HS2 has gone ahead costing billions of pounds more than first suggested but for South Kilburn residents the question is still whether on South Kilburn the proposed vent will 'lead to bedlam on our roads, disruption to the education of school children and a compromised local environment.'

Unfortunately as officers note the legislation gives HS2 enormous powers and limits that of the Planning Committee:

The above mentioned approvals have been carefully defined to provide an appropriate level of local planning control over the works while not unduly delaying or adding cost to the project. As such the legislation states that planning authorities should not through the exercise of the Schedule seek to revisit matters settled through the parliamentary process, seek to extend or alter the scope of the project, modify or replicate controls already in place, either specific to HS2 Phase One such as the EnvironmentalMinimum Requirements, or existing legislation such as the Control of Pollution Act or the regulatory requirements that apply to railways.

 

For residents the immediate issue will be noise from the site and associated vehicle movements with extensive ground works required. These issues are not the subject of the report:


Mitigation includes a small strip of grass to be made available to St Mary's Primary School, walls and fencing around the perimeter of the site and  the widening of the cross-over with Canterbury Road from 3 metres to 6 metres.

There is only one objection recorded on the Brent Council Planning Portal froma resident of Canterbury House:

The current design is radically different from the original proposal. There are more buildings and the design height is much greater; the original proposal included the extraction fans installed underground but the revised plans are far more intrusive on residents neighbouring the development. The current proposed height of the headhouse building will have a major impact on natural light and views available to the properties at the rear of Canterbury House. Residents of Canterbury House bought their properties with knowledge of the original plans but there are deep concerns that the revised plans could significantly deter potential future buyers. If the first plan to construct the vents at Queens Park was withdrawn due to resident objections, why has the design at Canterbury Works revised in such a way that the impact on nearby residents will be significant and possibly more so than what was proposed at Queens Park. 

Planning officers say:

The committee report states at paragraph 16 that there would be no breach of the 30 degree rule when considered in relation to Canterbury Terrace. However, there would be a slight breach of the 30-degree rule from two of the ground floor units due to the greater height of the ventilation stacks which sit adjacent these homes. However, given the separation distance (approximately 18 m) and the fact that a daylight/sunlight report has been submitted to demonstrate that there would be no harmful loss of light, the breach is considered acceptable in this instance. It is also important to note that the Design and Access Statement confirms that the vertical ventilation stacks have been reduced in size to the minimum required in both plan dimensions and height. Therefore when having regard to the fact that the LPA are required to given consideration to whether the works 'ought to or could reasonably' be modified to protect local amenity, given the information provided the arrangement is considered acceptable.

A supplementary report responds to a late comment:

Since the publication of the agenda one further comment has been received in relation to the application. This comment raises concerns about a lack of mitigation or compensation for protecting or safeguarding South Kilburn's residents' quality of life. It also makes reference to the new tree planting HS2 are doing in the Chilterns and the lack of any similar mitigation for Brent. The potential impacts on surrounding properties is discussed within the committee report.

Firstly, it is important to note that HS2 works in South Kilburn and the Chilterns are very different. It is also important to note that the character of the areas differ greatly with South Kilburn being a far more urban environment. As this is not a planning application, the Local Planning Authority are unable to seek obligations to secure funding for tree planting in the area.

However, whilst the committee report focuses on the works for approval, the submission does include a number of 'For information' drawings to show future intentions of the site. As stated in the committee report a follow up application for 'Bringing into use' is required to be submitted, whereby HS2 are required to demonstrate that the impact of the development has been mitigated as far as possible. This is expected to include a detailed landscaping and tree planting scheme on site and the provision of a 'pocket park' to provide educational opportunities to neighbouring St Mary's PrimarySchool. However, it important to note that these works are not for approval under this application.

 


 

 

Monday 4 May 2020

Defer these vital planning applications until residents can participate

There are still no clear instructions on the Brent Council Democracy web page (above) on how residents can make representations on planning applications that are tabled for Wednesday's virtual meeting.

Given this blog's long-standing campaign for transparency and accountability in local government I can only echo Paul Lorber's call to Cllr Denselow, the chair of the Planning Committee and its members, that the weighty planning applications be deferred until such time as site visits can take place and residents without internet access can make representations for or against applications.

These are the applications tabled for Wednesday:

  1. APPLICATIONS FOR DECISION 

  2. 18/4919 1-26A, coachworks & storage areas, Abbey Manufacturing Estate, all units Edwards Yard, Mount Pleasant, Wembley, HA0 
  3.   Demolition and erection of a mixed use development of buildings ranging between 3 and 14 storeys in height comprising residential units (use class C3), flexible commercial floorspace falling within use classes A1, A2, A3, A4, B1(a), B1(c), D1 or D2, associated car parking, landscaping and ancillary facilities (Phased Development)


  4. 19/1241 Car Park next to Sudbury Town Station, Station Approach, Wembley, HA0 2LA 
  5.   Re-development of existing car park for the erection of two blocks of residential dwellings, with associated residential amenity space, refuse storage, cycle parking, landscaping and other ancillary works, together with re-provision of disabled car parking bays nearest to Station Approach to serve Sudbury Town Underground Station (DEPARTURE FROM POLICY CP21 OF BRENT'S LOCAL PLAN).


  6. 19/3092 Ujima House, 388 High Road, Wembley, HA9 6AR 
  7.   Demolition of the existing building and erection of a new building up to a maximum height of 39.6m comprising up to 5,000sqm residential floorspace (Use Class C3), up to 600sqm of flexible workspace (Use Class B1A, B and C), with ancillary cafe (Use Class A3) up to 600sqm ancillary floorspace, associated hard and soft landscaping, wheelchair car and cycle parking.


  8. 19/3259 1-7 and 15-33 Peel Precinct and garages, 97-112 Carlton House, Canterbury Terrace, 8-14 Neville Close, 2 Canterbury Road, London, NW6 
  9.  
  10. Full planning application for a phased development for the demolition of 2 Canterbury Road, 1-7 and 15-33 Peel Precinct and 8-14 Neville Close, and erection of seven buildings (A to G) ranging between 5 and 16 storeys, plus part basement, comprising private sale residential units (Use Class C3), shared ownership residential units (Use Class C3), social rented residential units (Use Class C3); new health centre (Use Class D1), new gym (Use Class D2), flexible use class within retail and commercial units (Use Class A1/A3/B1) at ground floor, associated landscaping, highways and public realm improvements (including new public space and market square), private open space, associated car parking, cycle parking and servicing provision
  11.  
  12. FULL DETAILS HERE 

Monday 11 February 2019

Development plans for South Kilburn's Neville House and Carlton House

Ariel view of the present site
The Plans
Brent Council has published (Reference 18/4920) its planning application for Neville House, Carlton House and several neighbouring buildings on the South Kilburn Estate LINK:
Demolition of all existing buildings and erection of a part six, seven, eight, nine, ten and twelve storey building arranged around a courtyard (Western Building) providing 148 units (23 x studios, 53 x 1bed, 50 x 2 bed and 22 x 3bed) including a concierge and residential communal room at ground floor and a part seven, eight, nine and ten storey L shaped building (Eastern Building) providing 116 residential units (60 x 1bed, 38 x 2bed, 16 x 3bed and 2 x 4bed).  Construction of a basement under the Western Building with a car lift and access from Albert Road.  The provision of a shared surface with the extension of Neville Road from Denmark Road to Albert Road, with associated car parking, cycle provision, bin stores, landscaping and ancillary works. | 1-8 INC Neville House & Neville House Garages, Neville Road, 1-64 INC Winterleys and Seahorse Day Nursery, Albert Road, 113-128 Carlton House and Carlton House Hall, Canterbury Terrace London, NW6
As can be seen from  the images above the proposed new development is much denser and with the highest block 10 storeys, much taller. The amount of green space is reduced.



There are only two comments so far on the Planning Portal. One is classified as neutral and is concerned about the amount of car parking that will be available for 264 units. The over makes a number of points:
I strongly object to the current planning applications on the grounds that we will lose, privacy, light and outlook, especially those flats in Swift House that are south facing, looking over Albert Road.

I am the one of these Swift House flats and when I purchased the flat, the Brent council plans to replace Winterley, Neville and Carlton houses were to build 6 storey buildings max, which now have duplicated. This has a negative impact on the neighbourhood as well as on my property.

The main appeal when we purchased our flat was its light, privacy and outlook, which will be heavily diminished with the current planning.

Additionally, I would like to raise concerns about losing existing green spaces, amenity spaces and trees in the areas. The garden land around Neville House and Winterleys House will be replaced with 8 to 12 storey buildings that will make the area packed witch concrete. Also, the huge number of new dwellings will make the zone highly dense and increase the traffic narrow roads in the area.

With this in mind, I would like to object to these plans and ask to reduce the height of the buildings proposed in this plan, to reduce the impact on light and privacy on the surrounding buildings, and to avoid converting an area that now is airy and green into a packed, overbuilt and overcrowded area.
On social housing the Planning Statement claims:

The proposed development provides a 47 % quantum of affordable housing (measured by habitable room), with 100% social rent provision. 


The affordable housing units will be located in the Eastern Building. The provision of 116 socially rented properties represents an uplift of 36 socially rented properties on site compared with the existing provision of 80 social rented properties.
 

The Carlton House site is identified as having an indicative capacity for 66 dwellings, of which 29 for market and 37 affordable; and the Neville / Winterleys site as having capacity for 137 units, of which 61 would be market housing and 76 affordable units.


The Brent Council Forward Plan 15 indicates that the Cabinet on March 11th will discuss a ballot on South Kilburn Estate but gives no further information. The London Mayor has adopted a policy requiring ballots of estate residents affected by regeneration and one is to be held on the St Raphaels proposals.  This followed pressure from within and outside the Labour Party, including that of Geen Assembly Member Sian Berry. Release of Mayoral funding at £100k for each affordable unit and £28k for shared equity is dependent on ballots being held.

Residents will be concerned about the loss of community facilities involved in the proposals. The Planning Statement comments:
The proposed development will result in the loss of Carlton Hall, a 173 m2 community centre and a small community use (106 m2) on the ground floor of Winterley’s House that is currently used by a small nursery. Carlton Hall was previously used by the South Kilburn Trust, however this organisation has now moved to the new Carlton and Granville Centre within the wider South Kilburn estate. Carlton Hall will temporarily be used as a Doctor’s surgery until the 
 neighbouring Peel site is redeveloped where a new Health Centre Hub is being provided for the GP surgery in the longer term. The proposed Western Building will incorporate a small communal space on the ground floor that will be for the building’s residents use. 

It is considered that there is sufficient community use provision in the vicinity of the site which includes Carlton and Granville Nursey, and Carlton Vale Infant School. Within and close to the wider South Kilburn estate there is a range of community facilities. This includes the St Augustine’s Sports Hall (with community access), The Tabot Centre After School Club, The Xhamia e Shqiptareve Community and Cultural Centre and The Vale Community Centre. There are also a range of local sports facilities nearby including Moberly Sports Centre.