Wednesday, 25 October 2017

Consultation on new Overground stations at Old Oak Lane and Hythe Road

Transport for London is consulting on new transport connections as a result of the building of HS2 and the Elizabeth line. There would be new Overground stations at Old Oak Common Lane and Hythe Road. Details from TfL below.

CONSULTATION EVENTS

The Nadi Park Royal, 260 Old Oak Common Lane, White City, London NW10 6DX

Monday 30 October 12:30 – 19:30
Saturday 4 November 10:30 – 16:00
Monday 6 November 12:30 – 19:30

Overview

Old Oak and Park Royal is one of London’s largest Opportunity Areas and one of the largest development sites in the country, with the ambition to deliver a whole new centre and community for west London which includes 25,500 new homes and 65,000 jobs.
Old Oak is the only place where High Speed 2 (HS2), the new high speed railway between London, the Midlands and the North, meets the Elizabeth line, London’s new East-West railway. A new station at Old Oak Common will open in 2026, providing both connections to the Elizabeth line, HS2 and National Rail services and a hub for regeneration.
In 2014 we consulted on the idea of providing further transport connections to the London Overground network at Old Oak with three options proposed. Over 83 per cent of respondents either supported or strongly supported this idea. There was also a clear preference for Option C which suggested two new Overground stations; one at Hythe Road on the West London line and one at Old Oak Common Lane on the North London line.
Following on from the 2014 consultation, working closely with Network Rail and the Old Oak and Park Royal Development Corporation (OPDC), and co-funded by the European Commission, we have undertaken work to develop an initial design for the potential stations at Hythe Road and Old Oak Common Lane. We would now like your views on these designs.
In 2016 the Mayor of London carried out a review of the overall direction and work programme of the OPDC. The review recommended that additional work should be undertaken to support the case for the potential London Overground stations at Old Oak. Further work on the business case is currently underway and your views from this consultation will form an important part of the wider business case work.

Background

From 2026 HS2, the Elizabeth line and National Rail services are expected to call at a new Old Oak Common station and the area will benefit from excellent east – west rail connections, including to central London and Heathrow Airport.
Passengers wishing to travel by rail to Old Oak from the north or south would need to go by London Overground to Willesden Junction. Although Willesden Junction station is 1.5km away from the new Old Oak Common Station, there is no convenient link between the stations which would make it difficult for passengers to interchange between HS2, Elizabeth line or London Overground services.  
Providing good public transport connectivity at Old Oak would also support the regeneration proposed in the OPDC’s draft Local Plan (2017), the Old Oak and Park Royal Opportunity Area Planning Framework (2015) and the Mayor’s London Plan (2016).

What are the benefits of the new London Overground stations?

·      Better access to public transport across west London.
·      Enable more journeys to be made without going into central London, in turn reducing pressure on trains and stations in central London 
·      Improve access to HS2, Elizabeth line and National Rail services from areas of London connected to the London Overground network.
·      Enhance the regeneration benefits that HS2 and the Elizabeth line will bring to the Old Oak and Park Royal area.
·      Support the wider, OPCD-led development of Old Oak and Park Royal
·      Increase the number of destinations that can be accessed directly from Old Oak.

Working with our partners

Following on from the 2014 consultation, and supported with funding from the European Commission, we have worked up an initial design for both stations. Working closely with Network Rail and OPDC the designs have developed, leading to a single preferred option for each station. We have also worked closely with OPDC to ensure these designs would integrate with the proposals set out in its draft Local Plan.

What we are consulting on?

Hythe Road
Hythe Road station would be situated on the West London line about 700 metres from the Old Oak Common station and in one of the largest development sites within the OPDC area. This development site is owned by the company Car Giant and known as Old Oak Park. Car Giant, supported by the property development company London and Regional, is independently proposing a large-scale redevelopment of its land.

Hythe Road station

What options have been considered?

·      1A - a new London Overground station on the existing railway embankment, including embankment widening where required
·      1B - a new station and railway viaduct to the north of the existing embankment. This option would mean the removal of the existing embankment
·      1C - a new station and railway viaduct to the south of the existing embankment. This option would also mean the removal of the embankment

Which option is TfL consulting on?

Option 1B is the preferred option as it provides greater opportunity for regeneration and the creation of new spaces that support the wider development. In addition, this option reduces the severance caused by the embankment, making it easier for people to move around the area. 
Old Oak Common Lane
Old Oak Common Lane station would be situated about 350 metres to the west of the HS2 and Elizabeth line station, sitting on the North London line between Old Oak Common Lane and Midland Terrace. This station would provide the most convenient interchange between London Overground, HS2, the Elizabeth line and National Rail services. The location of this station is constrained by other railway lines, roads and residential properties.
To the west of Old Oak Common Lane station, there is an aspiration to provide a pedestrian and cycle link, connecting Old Oak Common Lane and Victoria Road. This link would make it easier for people to move around the area as currently the patchwork of railway lines act as a barrier. While a pedestrian / cycle link crossing the railway lines is not essential for the new station, we have included possible provision for such a link in each option as we believe it would be important for opening up the wider area.

Old Oak Lane station

What options have been considered?

·      2A - a new station with a sub-surface ticket hall and concourse. This option would include potential for an underpass between Old Oak Common Lane and Victoria Road
·      2B - a new station with an elevated ticket hall and concourse. This option would include potential for a bridge, linking pedestrians and cyclists between Old Oak Common Lane and Victoria Road

Which option is TfL consulting on?

Option 2B is the preferred option as it reduces the level of disruption to the railway during construction and provides better value for money.
Although the provision of an overpass to Victoria Road is not a requirement of the potential station, the design would allow for this to be provided, either at the same time as the station or at a later date. The decision to proceed with such a link is not confirmed and would be subject to further review and discussion with local stakeholders including residents, landowners and OPDC.

What happens next?

The business case work for the stations is being undertaken at present and further work is required to determine the future operational requirements. In addition, the work is only funded up to the end of the current stage, and investigations are under way to consider how the stations could be fully funded. The outcome of this consultation will inform the business case work, and ultimately will help us determine next steps.
If there is support to build the two stations, and funding is confirmed, powers to build and operate them would need to be secured through a Transport & Works Act Order. As part of this process it is likely the proposals would be examined at a public inquiry before being determined by the Secretary of State for Transport.
Further consultation on the proposals would be carried out before we submit a Transport & Works Act Order.

Public events

We are holding public events to give people the chance to ask questions and meet the project team. These events are taking place at;

The Nadi Park Royal, 260 Old Oak Common Lane, White City, London NW10 6DX

Monday 30 October 12:30 – 19:30
Saturday 4 November 10:30 – 16:00
Monday 6 November 12:30 – 19:30

Have your say

We would like to know what you think about our proposals.
Please give us your views by completing the online survey below by
Alternatively, you can:
·       Email us at consultations@tfl.gov.uk
·      or write to us at FREEPOST TFL CONSULTATIONS
You can also request paper copies of all the consultation materials and a response form by emailing consultations@tfl.gov.uk, or writing to FREEPOST TFL CONSULTATIONS.
The sole responsibility of this publication lies with the author. The European Union is not responsible for any use that may be made of the information contained therein.

Have your say


-->

Half-term actvities at Welsh Harp Environmental Education Centre

The Bat and Moth Walk at the Welsh Harp Environmental Centre has had to be cancelled. However the actities below are still taking place:


25th& 26th October:

Mini-beast orienteering! 10.30am –12.00pm

Use a map to explore the woodland for minibeasts. £3 per child, suitable for 5-8 year olds.

Den building 1.00 –2.30pm

Learn how to survive in the wild by making a shelter, and see a fire lighting demonstration.£3 per child, suitable for 5–12 year olds

27th October:

Spooktastic fun! 3.30 –5.30pm

Get your Halloween costume on and join us for pumpkin carving and a woodland walk. £4 per child. Bring your own pumpkin & a light to put inside it for the walk, carving tools provided.

How to book:

Phone: 07734 871 728 or 07711 701 694

Please bring cash on the day or pay via Just Giving website

Full Terms and Conditions:
Children can only participate with a supervising adult. This adult is responsible during the visit for making sure that:
·      Children they have brought are supervised at all times and are responsible for their behaviour.
·      Minimum ratio of 1 adult to 3 children.
·      Adult supervisor will need to provide any specific medication for children.
·      All visitors should bring their own lunch with them on the day if they plan to stay for both morning and afternoon sessions.
·      We have a maximum group size of 20 children therefore those who are not booked will only be admitted if spaces are available.
·      Each session costs £3 or £4 per child or has a suggested donation per person as stated.
·      All activities are suitable for ages 5 and over, age ranges stated are as a guide.
·      Children and adults should wear comfortable outdoor clothing that may get dirty.
·      Bookings must only be cancelled in extenuating circumstances and Thames21 must be notified at least 3 days in advance.
·      Thames21 reserves the right to cancel a visit if weather conditions are deemed unsafe or if adult to child ratio is not met.

Concrete blocking Wembley High Road's main sewer will add to residents' woes




Wembley Central residents, already suffering from  dust and air pollution as a result of building works in the High Road are now faced with works on the main sewer that runs beneath the busy road.

Thames Water confirmed today that there is concrete in the sewer ands they are having to use tankers to pump out the sewage which would normally flow through the blocked pipe.

A spokesperson for Thames Water said, 'We are investigating the source of the concrete and hope to start work to remove if from the sewer next week. Sadly this is an all too common problem that we face.'

The works are likely to cause more chaos with Wembley Stadium having a full programme of events over the next few weeks. 

Tuesday, 24 October 2017

Construction & demolition dust should concern construction bosses

This piece by the acting news editor of Construction News LINK echoes concerns voiced by Wembley Central residents over dust from the demolition and construction  taking place in the High Road, Wembley.


A short walk from Construction News’ offices in Old Street, the refurbishment of the shop formerly titled Acme Electrical Co is well under way.

While the noise emanating from inside sounds like someone has captured a remnant of storm Brian, outside each passing breeze brings to life a dust cloud that wafts into the street. On the floor, plasterboard offcuts and old brick mortar are trodden into London’s pavements by commuters.

It is a scene repeated across the capital.

Almost everywhere you look London is busy building the latest version of the 2,000-year-old metropolis.

Every new development, demolition or refurbishment comes with an issue that is increasingly on the minds of politicians and the public alike: air pollution.

London’s mayor Sadiq Khan has woken up to the problem and is tackling it initially with the introduction of a new T-charge for polluting vehicles in the capital.

But in calling for new government powers to tackle air pollution, the mayor also said that “non-transport sources contribute half of the deadly emissions in London” and urged a “hard-hitting plan of action”.

There’s little doubt that controlling dust is a difficult problem for any construction firm.

The fact that construction site dust has shot to the top of the political agenda – at least in London – should mean that construction firms now take note.

However, it is not only the mayor of London’s air pollution plans that should cause concern for construction bosses.

According to the Health and Safety Executive (HSE), respirable crystalline silica dust is the second-biggest killer of construction workers after asbestos.

And, in an industry that records a death rate three times higher than that of other professions including medicine, dust is a serious cause of illness.

Of course there are safety measures in place, but are they enough?

Could they be about to be made tougher? And, if as a sector, construction is aware of the risk that particle pollution has for both staff and the general public, what is the culpability for failing to act?

A number of years ago I was asked by a family to help trace the work history of their deceased father.

The man had worked on hundreds of construction sites in London between the 1930s and 1960s - including prestigious schemes such as Wembley Stadium and Broadcasting House.

Trawling through the London Metropolitan Archives as well as the back catalogues of titles such as Construction News and sister title Architect’s Journal, I was asked to look for one thing: evidence of asbestos.

The fact that the original builders who had been the deceased man’s employer had long since gone out of business did not deter the legal claim that the family was looking to file decades after the event itself.

The man had died of mesothelioma – a cancer that develops from asbestos fibres lodged in the lining of the lungs.

The research request came as part of a call for evidence to prove culpability for the illness during the man’s career.

The big question for the sector is: with the evidence of the health risks that particle pollution can cause, could there be similar legal issues in the decades to come?
Tim Clark, acting news editor, Construction News

Brent disabled advocacy voluntary organisation faces closure as a result of NHS Estates income maximisation

 Nearly a year after I published concerns that Brent Advocacy Concerns would lose its space at the PFI Willesden Health and Care Centre LINK as a result of the NHS Estates policy of gaining market rates for its property LINK the situation has not been resolved, and if anything has worsened. As a small voluntary organisation BAC is unable to afford the market rate plus rent demanded,

Despite 'good intentions' voiced by NHSPS, Brent CCG and Brent CVS to help Brent Advocacy Concerns I understand that Burnley Medical Practice will be relocating to the space that houses  Brent BAC with premises that will be designed for 12,000 patients.  Work is due to start in January 2018.

Brent Advocacy Concerns, a voluntary organisation will have to close or move, but state that 'nobody, including Brent Clinical Commissioning Group, will tell us anything.'

BAC's webpage LINK sets out the benefits of advocacy:
Advocacy is about making sure that you as a disabled person can make your voice heard, especially when dealing with local services and the health and benefits systems.

Advocates are likely to have first-hand knowledge and experience of what you’re going through, and are well-equipped to help you get your point across. They might work with you one-to-one, or link you with a group of similar people; they might be needed for a short time of crisis, or for providing longer-term support.

Everyone’s situation is different, and the aim is always to find the best solution for each individual. We believe that every disabled person has the right to be properly heard, and to have choice and control over their lives.

It would be a shame if the income maximisation policy of NHS Estates and the repercussions of PFI deprive Brent residents of this service.

Monday, 23 October 2017

Check the record of Laing O'Rourke winner of £700m Brent Cross pre-construction contract



--> It was announced today that Laing O’Rouke has been appointed under a pre-construction agreement as part of a two stage tender process for the main construction work of the Brent Cross  regeneration with an overall value of £700m.
Laing O’Rourke will work with Hammerson and Standard Life Investments to finalise the design and procurement in order to enable a start on site in 2018. 

The regeneration of Brent Cross London will double the size of the existing centre to 2 million sq ft of retail and leisure space. This will include up to 150 new retail stores and 50 new restaurants, a leisure and cinema offer, hotel accommodation and, it is claimed, improved public spaces including a new town square. The plans also include a relocated and enlarged bus station as well as, it is claimed, improved transport and highways infrastructure.

The regeneration has been opposed by residents in both Barnet and Brent concerned with over-development and and a significant increase in traffic. See Coalition for A Sustainable Brent Cross

O’Rourke hit problems earlier this year when it posted a £245m loss as a result of a PFI contract in Montreal. LINK

Earlier in October this year  two subsidaries of the company were fined a total of £3.8m after a worker was crushed by an 11 tonne concrete panelin Worksop in 2014. LINK


HSE inspector Stuart Pilkington said after the hearing: “This tragic incident led to the avoidable death of a young man, whose death could easily have been prevented if the companies had acted following previous warnings to identify and manage the risks involved, maintain the equipment, and put a safe system of work in place.”


Laing O’Rourke was fined £800,000 in March of this year over an incident in which, again in 2014, a worker crushed his own brother to death while driving a dumper at a building site for a multi-storey car park at Heathrow Terminal 2. LINK




'Alice in the Cuckoo's Nest' Barham Community Library December 12th and 20th


From Barham Community Library


Live Theatre is coming back to Barham Community Library.

Our friends at the Librarian Theatre are performing their version of Alice. 

We offer a choice of two evening performances on Tuesday 12 December or Wednesday 20 December both starting at 7:30p.m.   Additional dates Preston Library on 14th November and 19th December at 7.30pm

As we have options for more performances we are encouraging early orders so we can decide on possible extra performances (including an afternoon Matinee) just before Xmas on 22nd and 23rd December.

Please help us out by ordering your tickets as early as you can.

Note from the Wembley Matters Editor: 

Alice in the Cuckoo’s Nest re-imagines Lewis Carroll’s classic story in the setting of a modern day mental institution. Although the show is family friendly, it is a far cry from the innocent adventure portrayed in Walt Disney’s 1951 film.

Please note that this is not a children’s show, and the production explores adult themes of mental health.