Sunday, 3 October 2021

BRENT SOS: Tribute to Brent library campaigners 10 years after Brent Council closed half our libraries


 In the guest post below Paul Lorber, volunteer at Barham Library reflects on the battle against the closure of six Brent libraries, at the time half of the total libraries in the borough.  There were debates within SOS Brent Libraries over the issue - some wanted to concentrate on maintaining the provision of a locally accessible, properly funded professionally staffed library while others, although agreeing with that as a long-term aim, wanted to safeguard the actual buildings and stocks with  short-term volunteer led provision. Taking the legal route was an option undertaken only after considerable debate and produced national headlines. LINK

Four of the six were 'saved' one way or another but Neasden, despite being in one of the poorest areas in the borough had no high profile backing it and is now a church. Tokyngton Library, across the River Brent from St Raphaels Estate, was sold off to an Islamic Association in which  Muhammed Butt  was alleged to have an interest. LINK On the other hand Kensal Rise campaigners had access to a long list of celebrity authors to back their campaign.

The closures led evetually to the demise of   Council Leader Ann John, and her replacement by Muhammed Butt.  It is interesting to revisit the Open Letter that former Brent Labour councillor Graham Durham wrote to him at the time. LINK 

Brent Council began to give some tentative assistance to the volunteer libraries but with no commitment to full reinstatement of the services, signing a Memorandum of Understanding with them in 2017.  LINK

 Recently Preston Community Library after some internal disagreements, has moved to temporary premises while a block of flats is being built on the  redeveloped site with space for a volunteer library on the ground floor.

 



Guest post by Paul Lorber, library volunteer, Friends of Barham Library

 

he second week of October marks 10 years since Labour Councillors in Brent put the final nail in and closed 6 public libraries in Brent. Libraries in Barham Park, Cricklewood, Kensal Rise, Neasden, Preston and Tokyngton were closed after a long battle to save them.

 

There was massive opposition to the closures proposed by the Labour run Brent Council with large petitions, protests and well attended meetings. Local Campaigners raised over £30,000 and took the Council to Court and it was only after they lost their case and the Judge denied them the right to appeal that Brent Council was finally able to close the 6 public libraries for ever.

 

What Labour Councillors did not expect was the determination of dedicated local people to fight on and establish their own Community Libraries to continue the provision of service to the public.

 

They decided to close 6 local libraries (half the total) to save around £1 million. Around 80% of that cost related to staff costs. Local people asked the Council to hand over the Library buildings so that volunteers could run the Libraries instead. This offer was refused despite the fact that 3 of the Library buildings were gifts to local people - Cricklewood and Kensal Rise from All Souls College Oxford and Barham Park from Titus Barham of Express Dairies.

 

For 10 years dozens of local volunteers have kept the dream of local libraries alive and 4 have survived - Barham Community Library has moved around between Barham Primary School, High Road Wembley and finally Barham Park itself and has been actively providing a service for 10 years. Preston Community Library eventually fought its way back into its own building and while Kensal Rise and Cricklewood Community Libraries had their old buildings sold to developers All Souls College, to their credit, insisted that space was made available to the reborn Community Libraries. Kensal Rise has been operating for some time and Cricklewood is hoping to open soon.

 

While the Community Libraries cannot compete for money and resources with Brent Council funded libraries they compensate for this with the dedication of their volunteers and their ingenuity in providing a wide range of local services. Barham Community Library has put on live theatre, Preston has a Film Club while Kensal Rise has put on Author and Comedy events. They all provide the usual book lending services and a wide range of activities for people of all ages.

 

Some of us have been around right from the outset. Over the past 10 years hundreds of people have helped and volunteered to keep the Community Libraries and the spirit of community service alive.

 

I still think that Labour councillors made a big mistake in closing the public libraries and refusing to work in partnership with local people. It is for Labour Councillors to look in the mirror and admit that they made a big mistake.

 

Today, while remembering the battles of 2010 and 2011, I just want to pay a Tribute to all those dozens of dedicated people who recognised the importance of local libraries and would not allow them to die. And of course the best way of recognising this achievement is by paying a visit and supporting your local Community Library in Barham Park, Cricklewood, Kensal Rise and Preston is by paying a visit and borrowing a book or two.

 

 

Brent campaigners at a national demonstration

 

EDITOR'S NOTE


I would be interested in other campaigners' comments on the campaign and what has eventually transpired. 

 

 

Friday, 1 October 2021

UPDATED SCANDAL: South Kilburn blocks so badly built for Brent Council that remediation exceeds the original purchase cost


A report going to Brent Council's Wellbeing and Scrutiny Committee next week LINK reveals that blocks built in 2009 on the South Kilburn Estate by Higgins suffer from water penetration and cladding, fire safety and window issues. The blocks are known together as Granville New Homes.

The problems are so bad that demolition was one of the options considered. Brent Housing Partnership purchased the properties for £17.1m and the estimated cost of remediation works is £18.5m.

The report summarises the issues:

First Wave Housing (FWH)  is one of the Council’s wholly owned housing companies. It is a registered provider with 326 properties. Of FWH’s 326 properties, 110 are located at Granville New Homes. These 110 properties comprise of 84 social rented properties, 25 intermediate rented properties, and one leaseholder. 
 
Granville New Homes is a residential development that completed in 2009. It was developed by the Council and Higgins. The Council’s Arms Length Management Organisation, Brent Housing Partnership (BHP), purchased the properties at a cost of £17.1m. This figure met the Council’s development costs and was funded via a loan from the Council. BHP also received 45 one bedroom market rented properties in order to cross subsidise the acquisition, as on its own, the purchase of Granville New Homes would not have been viable for BHP. Since 2009, the properties have been managed as part of BHP/now FWH’s portfolio. 
 
FWH commissioned a report from Ridge Consultants to investigate water penetration, cladding, fire safety and window issues at FWH’s Granville, Princess, and Canterbury blocks (otherwise known as Granville New Homes). Ridge have recommended that works be carried out at the blocks to remediate these issues. It is estimated that the cost of works will be £18.5m.

A report going to Cabinet on October 11th after Scrutiny has considered the issue set out the options that were rejected: 


The Ridge Report that was commissioned by the Council outlined the main problems:

The Ridge report stated that the issues identified are not easily repairable in a way which will offer a guaranteed and satisfactory solution. On this basis, the only available option is to replace the facades, roof coverings and balcony waterproofing systems. These works include:


· Removing and replacing all cladding (both cementitious and brick effect panel) with non-combustible A1 or A2 fire rated materials;
· Stripping external façades and removing all external doors and windows;
· Providing new external doors and windows within a new panelised cladding system;
· Replacing insulation; and
· Stripping roofs and providing new roof coverings. 3.9 Including consultancy services, the waking-watch, the fire alarm system and contingency allowances, the estimated total cost of remediation works is circa £18.5m (including VAT). This figure includes £2m of contingency costs. If the remediation is carried out as outlined, the estimated completion date is September 2023. At present these costs are not affordable for FWH. It should be noted that the £18.5m is an estimated value from Ridge; until works are tendered and completed the actual cost will not be known
.


The Cabinet Report suggests the following complex  option to resolve the issue:

5.1 The recommended option is for FWH to dispose of the blocks to the Housing Revenue Account (HRA) and for the HRA to carry out remediation works as recommended in the Ridge report. There are nuances to this option in regards to how the transaction would be structured. These are detailed in section 6.

However, broadly, under this option:

 

· The transfer occurs at zero value as the blocks’ asset valuation of £12.5m is offset by the £15.4m of works required to the asset (the figure excludes VAT as this is reclaimable by the Council). The HRA as part of the Council will come
within the scope of public law principles. Therefore, it cannot act unlawfully or irrationally. Therefore, the HRA cannot pay a sum for the blocks.
· The HRA carries out the remediation works.
· The 84 social rented tenants would become secure Council tenants.
· The 25 intermediate rented tenants would be transferred to i4B under the recommended option; the HRA will recharge i4B for its proportion of the works.
· FWH’s loan for the blocks would be refinanced to a more affordable rate.
· As the transfer will formally be valued at zero value by the valuer no capital gains or SDLT costs are anticipated. As the transaction is a commercial transaction to support the ability of FWH to trade as a going concern, any tax
implications to the transfer are incidental and would be in accordance with General Anti avoidance Rules operated by HMRC. Tax advice from the Council’s tax advisors have confirmed this position.

 

5.2 The following assumptions have also been made:
· It is assumed the housing management function will be managed within existing staffing resources. There will be a reallocation of resource time and cost from FWH to the HRA to reflect the work associated with the transferred units.
· Rent inflation at 1.5% in line with CPI+1 and cost inflation at 2% per annum in line with Bank of England target rates.
· The cost assumptions in this report do not include estimates for decarbonisation works, as this is a known budget limitation across the sector.
· Further major works at £2,000 per property assumed from year 8 of the HRA Business Plan. 

 

5.3 This option balances the cost between FWH, i4B, the Council’s General Fund and the HRA. It also offers the minimum disruption to residents in the blocks by offering the most rapid solution to addressing the remediation works required.


Furthermore, it is acknowledged that this is a reasonable way to achieve appropriate levels of different types of housing tenure in the borough.

 


Higgins and Brent Council celebrating the start of the current Stonebridge scheme in December 2020 (first published on Brent Council & Higgins' websites)

 

The elephant in the room is of course Brent Council's partner in the development Higgins and what their responsibility is regarding these very expensive defects. Higgins, who appear to go under various names - Higgins Partnership, Higgins Homes, Higgins Group, seem to be a favoured partner of the Council with a £22m contract for 73 council homes in Stonebridge signed last August and another South Kilburn development at Chippenham Gardens.

 

I am sure councillors on the Scrutiny Committee will be keen to find out more about the partnership and its future.

 

UPDATE - Comment from Wembley Matters contributor Philip Grant

 

 First Wave Housing Ltd is the same company as Brent Housing Partnership Ltd - there was simply a change of name in 2017. It's details on the Companies House Beta website (Company No. 04533752) make for interesting reading.

The Chairman of the company appears to be Martin Smith (other details unknown), and other directors are Akintoye Durowoju (who appears to be a Chartered Surveyor and Brent Council employee), two senior Brent Officers, Phil Porter and Gail Tolley (although there is conflicting evidence about whether one or both have resigned or are still in post), and Councillor Saqib Butt (appointed in November 2020, after the previous councillor directors George Crane - to September 2020 - and James Denselow - Sept. to November 2020 - had both resigned).

The most recent accounts submitted are for the year to 31 March 2020. These include a £1.1m increase in the value of its properties, based on valuations by Jones Lang LaSalle. It will be interesting to see what their valuation is at 31 March 2021!

The balance sheet shows net assets of around £26.7m, but this includes a revaluation reserve of £15.5m. The cash flow (profit or loss) for the year showed a deficit of £264k.

There were loans of £36.8m from Brent Council, and the accounts were prepared on a going concern basis, as 'The Council has confirmed, in writing, of its intention for FWH to remain as a going concern for at least twelve months from the date of approval of the annual report and financial statements.' The financial statements were approved on 29 September 2020!

With the loss of rental income when a third of its properties are passed to Brent Council (and i4B), and the value of its Granville New Homes properties written down to NIL, but still with interest to pay on the loan from the Council
to purchase those homes in 2009, there must be some doubt over whether First Wave Housing Ltd can continue as a going concern.

 


 First Wave Housing Ltd outstanding £17.8m loan on Granville New Homes from the Companies House Charges Register

Thursday, 30 September 2021

Risks and opportunities along the Wealdstone Brook in Wembley Park - Part 1 of two looking at the FOE recent 'Flood and Nature Walk'

River Brent catchment area

 


GLA Brent flood risk areas LINK

A press release from the London Mayor, Sadiq Khan, on September 23rd reported on Climate Vulnerability Mapping carried out ahead of COP26. LINK

It said:

The boroughs at particularly high risk, meaning that the risk of both flooding and overheating are very high, jeopardising lives and livelihoods are:

 

  • Hackney
  • Hammersmith and Fulham
  • Islington
  • Brent
  • Tower Hamlets
  • Newham 

 A combination of factor contribute to flooding including over-flowing rivers; reduced permeability due to development, including reduced green space and the paving over of gardens, and drainage systems unable to cope with extreme weather events.

Aware of this, Brent Friends of the Earth last week conducted a Flood and Nature Awareness walk from Wembley Park to Stonebridge Park along the Wealdstone Brook and the River Brent.  This article provides some of the background requested by the walkers.

The top image above shows the catchment area of the River Brent with Wembley at its centre. The lower image is the flood risk of all types captured in the Climate Vulnerability Mapping.  Unfortunately there is no data for the immediate Wembley regeneration area but the 'High Risk' vulnerability is clear. The map is interactive so you can zoom into different areas by following the link.

The maps below whilst not so up to date gives more detail - the darker the blue the more vulnerable to flooding. Light blue is surface flooding:

 


 Ten years ago Brent Council's Surface Water Management Plan said: LINK

Finally, a combination of poor historical planning decisions, urban creep and infill development has had a further detrimental impact on the ability of the Borough to hold back the rain where it falls, Thames Water have calculated that there has been a 17% increase since 1971 in impermeable area across North West London, as residents have added extensions or have paved over front gardens. This results in greater volumes of surface water for each rain event entering the system. This effect accumulates further down the system where the increasing volumes create greater pressures on the below ground piped assets, tending to result in overland flood flows, increasing frequencies and levels of discharges at overflows and flooding of peoples properties with contaminated foul and commercial wastewaters.

The amount of impermeable land in the borough must have increased  greatly since then.

Wikipedia records fluvial flooding LINK:

  • 1682: A very violent storm of rain, accompanied with thunder and lightning, caused a sudden flood, which did great damage to the town of Brentford. The whole place was overflown; boats rowed up and down the streets, and several houses and other buildings were carried away by the force of the waters.[53]: 39–58 
  • 1841: Brentford was flooded by the Brent Reservoir becoming overfull so that the overflow cut a breach in the earth dam. A wave of frothing and roaring water swept down the river's course taking all before it causing fatalities. Several lives were lost.[54]
  • 1976 and 1977: in the summer Britain saw drought and unusual heat with Water Companies declaring it would take six or seven years for empty reservoirs to recover. The following August, a rainy spell was followed by a day and night of torrential rain that overwhelmed the Brent reservoir — authorities decided to open the sluice gates maximally at time of highest volume and pressure, to avoid costly overflow flooding, having been under general pressure to keep stock water supplies. Later, before the river below overflowed in many sections certain local sewers overflowed, some into homes. The streets, including arterial roads were jammed and local trains blocked. Hundreds of homes and businesses closed for the clean-up, with widespread press coverage.[citation needed]
  • 2007: August saw heavy rain cause a short bout of flash flooding in Brentford and Hanwell on roads, the Hounslow Loop Line and London Underground.
  • 2009: On 30 November, the Environment Agency warned residents of a flooding along River Brent from Hendon to Brentford, after a day of notably heavy rain. Several premises were temporarily flooded in Brentford and Perivale.[55]

Local resident John Timms who has studied the 1977 flood in detail says that in fact the flow of the Wealdstone Brook had already increased significantly before the Welsh Harp sluice gates were opened and had caused flooding in Kenton and flooding followed down river with the draiage system unable to cope.

Laurie Pavitt, MP for what was then Brent South presented a petition to the House of Commons:

With your permission, Mr. Speaker, and that of the House, I beg leave to present a petition signed by 588 of my constituents who seek relief from the acute anxiety that arises especially among the elderly, in my area whenever there is a heavy downpour of rain.

The petition sheweth That 71 households were flooded with sewerage water following the heavy rainfall on 16th and 17th August 1977. That this disaster has caused severe physical, mental and financial distress, and that investigations reveal that these floods were not unexpected, and according to expert engineering opinion the risk of further flooding has been rapidly increasing due to extensive new building developments and drainage systems. Planned and approved alleviation works have not been implemented and the reason given for this failure has been the shortage of finance. At a time of cuts in public expenditure which affect all citizens, the people of Stonebridge have had the additional burden of living through a disaster which has destroyed the contents of the ground floors of their homes, with all the consequent hardship and suffering. Nor will they have the wherewithal to replace their losses, as most families have a weekly wage and live from week to week.

The petition concludes: Wherefore your petitioners pray that your honourable House by legislation or otherwise ensure that:

 

(1) full compensation be paid adequately to restore that which was lost.

 

(2) the Ministry of Agriculture, Fisheries and Food shall, in conjunction with the Greater London Council, seek to implement a satisfactory flood alleviation scheme as a matter of urgency.

 

(3) temporary works and an effective flood warning system be put into operation immediately and that the lowering of the 1126 water level in the reservoir known as the Welsh Harp shall have high priority.

If you or your family were affected by these floods, and particularly if you have any photographs, John Timms is keen to hear from you for his research. Write to me at martinrfrancis@virginmedia.com and I will pass it on.


This was the background to our walk which started on the bridge over the Wealdstone Brook on Bridge Road.


 

 Wealdstone Brook serving as a green corridor from Bridge Road (north side)

Brook Avenue, named after Wealdstone Brook which flows alongside it, is the site of planned tower blocks on the station car park (currently subject to a Public Inquiry) but has also been ear-marked in the Local Plan as a potential site for development between the avenue and the brook.

 

The surburban side of Brook Avenue where gardens back on to the brook 

The modification to the Local Plan both suggests development of the site, including a larger Premier Inn, and enhancement of the brook area:

The Premier Inn site provides the opportunity to provide a more defined edge to Wembley Park Drive/Brook Avenue and introduce an active frontage containing main town centre uses.


The site is adjacent to a mixture of residential and commercial buildings up to ten storeys. Within this context, development that is taller than the existing two storey suburban dwellings will be acceptable to the eastern side of the site, stepping down towards the residential buildings to the west of the site which is identified as an intensification corridor along Forty Avenue.


· A minimum of 8m setback from Wealdstone Brook will be sought. Development will be required to positively contribute to the biodiversity, improve access to the waterway and provide an appropriate landscaped setback which may include public open space.


· The building line should be closer towards Brook Avenue.

The brook flows beneath Bridge Road to  the College of North West London on the south side. Here it emerges into a small green space with mature trees and some landscaping.

 

College of North West London Grounds

The College building is adjacent to a major redevelopment site called the 'Fulton Quarter' which includes the retail park, McDonalds and the former studios, currently the temporary Troubadour theatre. The College site is also due to be redeveloped.

According to John Timms in the 1977 flood this park of the brook reached a height of 11-1/2 feet.

However, the modifications to the Local Plan concentrate on surface water:

The site is in flood zones 2 and 3a and susceptible to surface water flooding. All proposed development will require a detailed Flood Risk Assessment (FRA). Development must be consistent with the recommendations of the Brent Strategic Flood Risk Assessment Level 2.

Due to the site’s location in Flood Zone 3a, the ‘sequential approach’ at site level should be applied to steer more vulnerable development such as residential, student accommodation, hotels, and certain community uses towards areas of lowest risk within the site; north west area and southern edge.


 Associated infrastructure including water attenuation tanks, and the diversion of any utilities and services to accommodate the development.


· Green and sustainable infrastructure should be part of the development process and the development.

Most significantly a paragraph follows in bold  that is repeated for many of the developments, including Brook Avenue,  covered in the Local Plan Modifications, which really requires additional scrutiny. Who in Brent will provide it?


Waste water facilities enhancement Thames Water has indicated the scale of development is likely to require upgrades to the wastewater network. Thames Water will need to be engaged at the earliest opportunity to agree a housing and infrastructure phasing plan to ensure essential infrastructure is delivered prior to the development creating identified additional capacity requirements.

 

The Fulton Quarter (yellow) with CNWL and Wealdstone Brook bottom left. Numbers equal storeys.

 The Wealdstone Brook is culverted beneath Olympic Way and emerges next to 1 Olympic Way which has recently been converted from office accommodation to housing. Previously, as with the neighbouring Michaela School building, and as planned for the Fulton Quarter, the ground floor was not occupied, presumably because of the flooding risk.

 

                                       Wealdstone Brook emerges from beneath 1 Olympic Way

The brook is canalised here and very soon is out of view as a  platform has been erected over it:

 

 

Now the brook meanders either side of North End Road with the attractive low rise Empire and Danes Court contrasting with the high rise developments. Soon we come across an interesting new development that was faced with the problem of potential flooding. It  is on the former Amex site and as you can see from the diagram surrounded on what is almost three sides by the Wealdstone Brook.

 

 


The planners recognised the flood risk:

The NPPF requires the Exception Test to be applied in the circumstances shown in Table 3 of the ‘Planning Practice Guidance: Flood Risk and Coastal Change’. Paragraph 102 of the NPPF makes clear that all elements of the test must be passed for development to be permitted. Part 2 of the test requires the applicant to demonstrate that the development will be safe for its lifetime taking account of the vulnerability of its users, without increasing flood risk elsewhere, and, where possible will reduce flood risk overall.

The flood modelling prepared by the applicant shows that North End Road would be inundated in both the 1 in 100 35% climate change event and the 1 in 100 70% climate change event, which appears to be the only access/egress route. This means that safe refuge within the development is required for future occupants as safe access and egress cannot be achieved. 
 
The finished floor levels of the development have been raised above the 1 in 100 chance in any year, including an allowance for climate change flood extent. This means that floodwater is unlikely to enter the property during a 1 in 100 chance in any year plus climate change flood extent. 
 
The applicant has overcome the EA’s previous objection by submitting an acceptable emergency flood plan framework to the local planning authority that deals with matters of evacuation and refuge to demonstrate that people will not be exposed to flood hazards.

Since the development was completed North End Road has been reconnected with Bridge Road at a very steep junction which in extreme torrential rain could see a flood of water coming down the road.

This development also raises a continuing problem - that of the pastekl drawings of the development versus the harsh reality. The long term plan to utilise and enhance the Wealdstone Brook as a feature was addressed in the application's depiction of a waterside walk. At the time it was unclear whether this would be open to the public - another long-term plan. It was festooned with Private notices when we dropped by. Compare the artists's impression with the reality.



The brook now runs past industrial buildings and another ptential development site named rather anonymously 'Central Place' -. It is between Fulton Road and Fifth Way with Wealdstone Brook to the north. There is a big warehouse and car park occupying the site.


The Local Plan Modification states (NB items in bold:

North of the site is the SINC Grade II Wealdstone brook. The site is recognised as a waterside development, as such, developers will be required to contribute towards restoration and naturalisation of the Brook, improve access to the waterway, provide appropriate landscaped setback, enhance water quality and biodiversity.
· Small sections of the site is susceptible to surface water flooding. The site is also adjacent to flood zone 3a (fluvial and tidal) so an appropriate buffer zone along the brook will remove the developable area of the site of any major risks.

A critical trunk sewer runs through this site which would need to be considered.

A buffer strip of at least 10m wide should be retained for a publicly accessible brook side park to allow for a cycle way/footpath, associated landscaping, tree planting and street furniture as agreed in consultation with the Environment Agency and Brent Council.

Infrastructure Requirements
· Developers would be required to contribute towards restoration and naturalisation of the SINC Grade II Wealdstone brook.
· Further master planning work will provide additional requirements.
· Green and sustainable infrastructure should be part of the development process and the development. 

 
· Thames Water has indicated the local water network capacity in this area may be unable to support the demand anticipated from this development. Upgrades to the wastewater network are likely to be required. Thames Water will need to be engaged at the earliest opportunity to agree a housing and infrastructure phasing plan to ensure essential infrastructure is delivered prior to the development creating identified additional capacity requirements. Public sewers cross or are close to the site. The risk of damage during construction must be minimised. It must be ensured that development doesn't inhibit access for maintenance or the services in any other way.

 There is quite a lot of vagueness in all this and as we have seen pretty plans sometime turn into something much less and there does not seem to be a reliable process, with staff availability low after government cuts,to make sure promises are delivered. 

As a result over concerns over potential flood danger as a result of climate change and severe weather events, now with the addition of Sadiq Khan's warning, I have put two questions to November's Full Council meeting:

In the light of the increased prevalence of extreme weather events as a result of climate change and recent flooding in the borough, as well as a large number of new developments and increasing numbers of paved over gardens, does Brent Council:

 

Intend to work with partners including the Environment Agency and Thames Water to review and revise Brent Council’s

 

1)    Flood Risk Management Strategy

2)    Surface Water Management Plan

 and advise property owners and developers on mitigation measures?

Look out for Part 2 where we walk from Brent River Park to the North Circular at Stonebridge

NOTE

In case you feel you need to know more about how to react in a flood as a reesult of reading this article  this is the guidance from Brent Council:

Be Aware. Be Prepared. The time to think is now don't wait until it happens.

See how putting a grab bag may will help you to respond see the preparing for an emergency page.

If your house is potentially at risk from flooding here are some key things to remember.

If you are in a flood risk area find out if you can sign up to the Environment Agency's free 24 hour Floodline Warnings Direct service by calling Floodline on 0345 988 1188 (or Type Talk: 0345 602 6340). You can select to receive warnings by phone, text or email.

Keep details of your insurance policy and the emergency contact numbers for your local council, emergency services and Floodline quick dial number somewhere safe - preferably as part of your emergency flood kit.

Know how to turn off your gas, electricity and water mains supplies.

If a flood is forecasted, take valuable items upstairs and take photos for insurance purposes.

Leave internal doors open, or ideally, remove them and store them upstairs.

Outside the house

Move anything not fixed down into a safer location, e.g. dustbins, garden chemicals car oil and similar.

Move your car to higher ground to avoid damage.

Weigh down manhole covers outside the house to prevent them floating away and leaving a hazardous hole.

See our page about who to call regarding drains and gullies for more advice.

For more information on preparing for a flood and other publications visit the Environment Agency's website

Sandbags

We do not supply sandbags or flood protection products directly to the public.

Builder's Merchants and DIY Stores may have sandbags available.

If you can't obtain sandbags, you can make them yourself by filling things like compost bags, old pillowcases or carrier bags filled with earth or sand.

https://www.brent.gov.uk/emergencies/severe-weather/flooding/