Thames Water have suppied Wembley Matters with the folloing updates on the polution of Wealdstone Brook
Wealdstone Brook Pollution Update
Date: 13 May 2022 Watercourse clean
· Daily pump outs at key locations have been undertaken to minimise odour.
· Rainfall on 11 May appears to have provided a flush of the surface water system
· The clean-up team will be onsite across the weekend in expectation of warmer weather.
· A programme for routine flushing frequency is being finalised with the contractor.
Investigations to find the source of the Pollution:
· Following multiple CCTV and man sewer entries, several point sources of fatty/oil waste have been identified in the Forward Drive/Cullington Close area and we are undertaking the formal gathering of evidence to establish if these are linked to the current pollution to the Wealdstone Brook.
· From next week we will be beginning investigations into a different catchment area (Greenhill/Harrow) that feeds the Becmead Road outfall to continue the investigation.
Next steps
· Thames Water Operations to begin investigations in Harrow Greenhill catchment.
· Identified sources of fat/oil waste to be addressed through Thames Water’s formal
investigation and enforcement processes.
· Further flushing and cleaning of the brook is planned to minimise the odour.
Next update: Latest Tuesday 17 May
Date: 10 May 2022 Watercourse clean
· A manual clean of the section from Becmead Avenue to Kenton Road was conducted across Friday 6 May – Sunday 8 May. The cleaning crew also extended the section past Kenton Road.
· Periodic flushes of the brook by Thames Water tankers are being arranged to limit stagnation and reduce odour.
· A further pump out of the brook by the Kenton Lane trash screens is being conducted on the afternoon of 10 May following an increase in odour reported.
Investigations to find the source of the Pollution:
· Following tracing work last week, the investigation crew found evidence of two potential wastewater inputs suspected to be linked to this current pollution event within the proximity of the Forward Drive area of Wealdstone.
· Additional Operational resources have been present onsite at this location 9 May and 10 May working to confirm if these sources are the cause.
· One input is a misconnected commercial premises – details of this property have been passed to our commercial and trade enforcement teams to resolve as an urgent priority.
· The second input found was evidence of a previous fat/foul discharge from an unmapped surface line directly into the culvert. The source of this discharge is yet to be established as it is originating from an unmapped line which slows the ability to trace the source.
Next steps
· Thames Water Operations continuing to trace the unmapped line on 10 May for the source of the fat/foul waste discharge.
· Further flushing and cleaning of the brook is planned to minimise the odour. Next update: Latest Friday 13 May
No comments:
Post a Comment